History

Tiffin through time

Every dated item of the town's history in the archive on one list: history notes, checked research claims, events read from the records, ordinances, resolutions of the kinds that mark the town's life, project milestones, the earliest appointment to each board and proclamations. Each line is as the records put it, with its page. Atom feed.

385 items match.

  1. May 7, 2019 Project Soccer Field Parking Lot Expansion: Motion to approve Resolution 2019-053 – A Resolution to Award Bid for the Soccer Field Parking Lot Extension Project by Ryan document 3597, p. 5 · meeting · Soccer Field Parking Lot Expansion · 2010s
  2. May 20, 2019 Spending The contract with Rathje Construction for the Tiffin Roundabout Project was for $3,041,340.31.
    “Contractor, for and in considerations of $3,041,340.31 payable as set forth in the specifications constituting a part of this contract,”
    document 6735, p. 2 · 2010s
  3. May 20, 2019 Figure The $3,041,340.31 roundabout contract with Rathje Construction of 2019 is about $4,000,000 in 2026 dollars. Derived
    “Contractor, for and in considerations of $3,041,340.31 payable as set forth in the specifications constituting a part of this contract,”
    document 6735, p. 2 · 2010s
  4. May 20, 2019 Project Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52): Resolution 2019-022 – A Resolution to Award Bid for the STP-A-006-7(90)--22-52 Project – Tiffin Roundabout Project document 6735, p. 1 · Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52) · 2010s
  5. June 4, 2019 History note Just compensation of $37,750, and a road built up to the Trust's line
    “1. Just Compensation for the acquisition of a portion of and/or an interest in the Property owned by John Powell Rarick and Robert Rarick as Trustees of the Trust created in the Last Will and Testament of Ruth E. Rarick, Deceased, is hereby established to be $37,750.”
    document 6791, p. 2 · meeting · Res. 2019-077 · history note · 2010s
  6. June 4, 2019 Spending Resolution 2019-077 established just compensation of $37,750 for a portion of or an interest in property owned by a family trust for the Forevergreen Road construction project.
    “1. Just Compensation for the acquisition of a portion of and/or an interest in the Property owned by John Powell Rarick and Robert Rarick as Trustees of the Trust created in the Last Will and Testament of Ruth E. Rarick, Deceased, is hereby established to be $37,750.”
    document 6791, p. 2 · Res. 2019-077 · 2010s
  7. June 4, 2019 Figure The $37,750 just compensation for a portion of the Trust property for the Forevergreen Road project of 2019 is about $50,000 in 2026 dollars. Derived
    “1. Just Compensation for the acquisition of a portion of and/or an interest in the Property owned by John Powell Rarick and Robert Rarick as Trustees of the Trust created in the Last Will and Testament of Ruth E. Rarick, Deceased, is hereby established to be $37,750.”
    document 6791, p. 2 · 2010s
  8. June 4, 2019 Project 2019 Park Road Paving Project: Motion to approve Resolution 2019-072 – A Resolution to Award Bid for the 2019 Park Road Paving Project by Havens document 3594, p. 4 · meeting · 2019 Park Road Paving Project · 2010s
  9. June 18, 2019 Neighbors Motion to table Resolution 2019-084 – A Resolution Approving a 28E Agreement Regarding the Temporary Connection to Forevergreen Road by Ryan document 3593, p. 3 · meeting · 2010s
  10. June 18, 2019 Resolution Resolution 2019-081 adopted: To Award Bid for the 2019 Improvements – Forevergreen Road Project Discussion: Clint Rarick posed questions on needing 28E agreement with neighboring public entities document 3593, p. 3 · meeting · Res. 2019-081 · 2010s
  11. June 18, 2019 Project 2019 Improvements – Forevergreen Road: Motion to approve Resolution 2019-081 – A Resolution to Award Bid for the 2019 Improvements – Forevergreen Road Project by Ryan document 3593, p. 3 · meeting · 2019 Improvements – Forevergreen Road · 2010s
  12. August 20, 2019 History note Condemnation authorized; the Trust deeds the south 250 feet to Coralville
    “The City of Tiffin, Iowa hereby approves the use of condemnation to acquire a portion of and/or interest in the property described herein and hereby directs attorney Robert W. Goodwin to proceed with condemnation procedures to acquire the portion of and/or interest in the property described herein.”
    document 6813, p. 3 · meeting · Res. 2019-100 · history note · 2010s
  13. August 20, 2019 Resolution Resolution 2019-101 adopted: Accepting the Dedication of Park Road Right-of-Way document 3587, p. 3 · meeting · Res. 2019-101 · 2010s
  14. September 4, 2019 Spending General Obligation Corporate Purpose Bonds, Series 2019A: $4,500,000, Streets, water, sewer and storm sewer
    “Resolution 2019-096 (bond purchase and levy)”
    document 6809, p. 1 · meeting · Res. 2019-096 · 2010s
  15. October 1, 2019 History note $41,300 for land owned by Coralville with reverter rights to the Trust
    “1. Just Compensation for the acquisition of a portion of and/or an interest in the Property owned by the City of Coralville with reverter rights John Powell Rarick and Robert Rarick as Trustees of the Trust created in the Last Will and Testament of Ruth E. Rarick, Deceased, is hereby established to be $41,300.”
    document 6824, p. 2 · meeting · Res. 2019-111 · history note · 2010s
  16. October 1, 2019 Spending Resolution 2019-111 established just compensation of $41,300 for property owned by the City of Coralville with reverter rights held by a family trust.
    “1. Just Compensation for the acquisition of a portion of and/or an interest in the Property owned by the City of Coralville with reverter rights John Powell Rarick and Robert Rarick as Trustees of the Trust created in the Last Will and Testament of Ruth E. Rarick, Deceased, is hereby established to be $41,300.”
    document 6824, p. 2 · Res. 2019-111 · 2010s
  17. October 1, 2019 Figure The $41,300 just compensation for the Coralville-owned parcel with reverter rights for the Forevergreen Road project of 2019 is about $54,000 in 2026 dollars. Derived
    “1. Just Compensation for the acquisition of a portion of and/or an interest in the Property owned by the City of Coralville with reverter rights John Powell Rarick and Robert Rarick as Trustees of the Trust created in the Last Will and Testament of Ruth E. Rarick, Deceased, is hereby established to be $41,300.”
    document 6824, p. 2 · 2010s
  18. November 5, 2019 Project 2019 Improvements – Forevergreen Road: Motion to approve Resolution 2019-119 – A Resolution for the Final Acceptance of the 2019 Forevergreen Road Project by Havens document 3582, p. 3 · meeting · 2019 Improvements – Forevergreen Road · 2010s
  19. November 19, 2019 Ordinance Ordinance 2019-462 adopted: Amending the Municipal Code of Tiffin, Section 63.04 of Chapter 63, Speed Regulations, for North Park Road, north of Oakdale Boulevard document 5101 · meeting · Ord. 2019-462 · 2010s
  20. December 17, 2019 History note Four lawsuits
    “All of the foregoing Lawsuits relate to a Tiffin road project which would connect Forevergreen Road in Tiffin to Forevergreen Road in North Liberty (“Tiffin Forevergreen Road Project”).”
    document 1592, p. 2 · history note · 2010s
  21. February 27, 2020 History note A stay, a ruling against the deed, and a new appraisal
    “WHEREAS, on April 28, 2020, the Court in Johnson County Case No. CVCV080519 Ruled that the Quit Claim Deed is invalid, and that “Tiffin retains the authority and jurisdiction to condemn this portion of the Trust’s property ... and Tiffin’s construction of Forevergreen Road in Tiffin is a public purpose and supports exercise of eminent domain over the Trust”, p. 11.”
    document 6891, p. 2 · meeting · Res. 2020-056 · history note · 2020s
  22. April 7, 2020 Decision Ordinance 2020-469 amended the zoning ordinance to address recreational vehicle parking and storage; the third and final reading was moved at this meeting.
    “Ordinance No. 2020-469 – An Ordinance Amending the Tiffin Zoning Ordinance No. 2007-287, and any Amendments Thereto, Amending Section 7.04(e), Parking or Loading, to Address Recreational Vehicle Parking and Storage”
    document 241, p. 2 · meeting · Ord. 2020-469 · 2020s
  23. April 21, 2020 Decision Ordinance 2020-470 amended the noise pollution chapter to prohibit the use of a motor vehicle engine brake.
    “Ordinance No. 2020-470 – An Ordinance Amending the Municipal Code of Tiffin, Chapter 48, Noise Pollution, Section 48.09 and 48.10, to Add Prohibiting the Use of a Motor Vehicle Engine Brake”
    document 240, p. 2 · meeting · Ord. 2020-470 · 2020s
  24. June 2, 2020 Ordinance Ordinance 2020-472 adopted: To Amend the Municipal Code of Tiffin, Iowa, Chapter 69, Parking Regulations, Section 69.07(17), to document 5110 · meeting · Ord. 2020-472 · 2020s
  25. August 25, 2020 Spending General Obligation Urban Renewal and Refunding Bonds, Series 2020A: $7,670,000, Phase II streets, a water well, the public works building, a sewer main, and refunding Series 2012A
    “Resolution 2020-063: $7,670,000 Series 2020A”
    document 6896, p. 3 · 2020s
  26. November 3, 2020 Project Traffic Signals – Ireland Avenue/Roberts Ferry Road and Highway 6/Marengo Road: Motion to approve Resolution 2020-086 – A Resolution for Final Acceptance of the Traffic Signals Project: Ireland Avenue/Roberts Ferry Road and Highway 6/Marengo Road; Tiffin, Iowa – Contractor – Price Industrial, LLC by Limkemann document 225, p. 3 · meeting · Traffic Signals – Ireland Avenue/Roberts Ferry Road and Highway 6/Marengo Road · 2020s
  27. November 17, 2020 Project 2019 Park Road Paving Project: Motion to approve Resolution 2020-090 – A Resolution for Final Acceptance of the 2019 Park Road Paving Project, Tiffin, Iowa – Contractor – LL Pelling Co. by Limkemann document 224, p. 3 · meeting · 2019 Park Road Paving Project · 2020s
  28. December 1, 2020 Report The capital improvements discussion records North Park Road urbanization in 2024-2025, a new water tower in 2025-2026 and the next GO Bond possibly in summer of 2023.
    “Summer of 2023 could be the next GO Bond. Sanitary Sewer Interceptor Line pushed out another year. Trail Phase 7 could be moved up 1 year as that project will start yet this year. Recreation Center would depend on when to start a Capital Campaign. North Park Road urbanize the road in 2024-2025. New water tower in 2025-2026”
    document 223, p. 1 · meeting · 2020s
  29. December 15, 2020 Project Permeable Paver Parking Project: Motion to approve Resolution 2020-097 – A Resolution to Award the Bid for the Permeable Paver Parking Project by Limkemann document 222, p. 4 · meeting · Permeable Paver Parking Project · 2020s
  30. February 16, 2021 Neighbors Resolution 2021-014 – A Resolution Approving a 28E Agreement between Johnson County Conservation Board, Johnson County, Iowa, and the City of Tiffin, Iowa, regarding Construction of Connecting Trail along Ireland Avenue and Trail Maintenance document 217, p. 3 · meeting · Res. 2021-014 · 2020s
  31. February 16, 2021 Resolution Resolution 2021-014 adopted: Approving a 28E Agreement between Johnson County Conservation Board, Johnson County, Iowa, and the City of Tiffin, Iowa, regarding Construction of Connecting Trail along Ireland Avenue and Trail Maintenance document 217, p. 3 · meeting · Res. 2021-014 · 2020s
  32. March 16, 2021 Project Soccer Field Parking Lot Expansion: Engineer Statement of Final Completion - Soccer Field Parking Lot Expansion document 3160, p. 1 · meeting · Soccer Field Parking Lot Expansion · 2020s
  33. March 16, 2021 Project Soccer Field Parking Lot Expansion: Motion to table Resolution 2021- 022 – A Resolution for the Final Acceptance of the Soccer Field Parking Lot Expansion Project, Tiffin, Iowa – Contractor – LL Pelling Co. by Bartels document 215, p. 3 · meeting · Soccer Field Parking Lot Expansion · 2020s
  34. April 6, 2021 Project Roberts Ferry Road Reconstruction: Motion to approve Resolution 2021- 026 – A Resolution for the Final Acceptance of the Roberts Ferry Road Project, Tiffin, Iowa – Contractor – Vieth Construction Corporation by Havens document 3115, p. 2 · meeting · Roberts Ferry Road Reconstruction · 2020s
  35. April 6, 2021 Project Soccer Field Parking Lot Expansion: Motion to approve Resolution 2021-022 – A Resolution for the Final Acceptance of the Soccer Field Parking Lot Expansion Project, Tiffin, Iowa – Contractor – LL Pelling Co. by Limkemann document 3115, p. 3 · meeting · Soccer Field Parking Lot Expansion · 2020s
  36. June 1, 2021 Decision Resolution 2021-043 authorized removal of stop signs at Blue Jay Court and Fawn Avenue and Dakota Avenue.
    “Resolution 2021-043 – A Resolution Authorizing the Removal of Stop Signs at Blue Jay Court and Fawn Avenue and Dakota Avenue”
    document 208, p. 3 · meeting · Res. 2021-043 · 2020s
  37. June 15, 2021 Report The mayor reported the responses on the roundabout design.
    “Mayor Steve Berner reports the responses on the roundabout design”
    document 207, p. 2 · meeting · project · Steven Berner · 2020s
  38. June 15, 2021 Decision Resolution 2021-047 authorized removal of stop signs at Redbird Run and Nightingale Drive.
    “Resolution 2021-047 – A Resolution Authorizing the Removal of Stop Signs at Redbird Run and Nightingale Drive”
    document 207, p. 3 · meeting · Res. 2021-047 · 2020s
  39. July 20, 2021 Resolution Resolution 2021-020 adopted: Approving the Name Change of a Portion of Ireland Avenue to Roberts Ferry Road document 215, p. 2 · meeting · Res. 2021-020 · 2020s
  40. December 21, 2021 Spending Seven bidders bid on the Tiffin Public Works Building; the low bid was Woodruff Construction at $2,552,000.00.
    “There were seven (7) bidders for the project. The low bid for the project was submitted by Woodruff Construction, Tiffin, Iowa. The bid submitted was $2,552,000.00”
    document 2794, p. 2 · meeting · project · 2020s
  41. January 18, 2022 Report The goal-setting report lists these long-term priorities: conversion of the water treatment plant to reverse osmosis, urbanization of Highway 6, a second water tower, a recreation building with room for an outdoor pool or aquatic center, and a WWTP upgrade.
    “Improve Water Quality – Conversion of Water Treatment Plant to Reverse Osmosis (Implementation) 2. Urbanization of Highway 6/Sidewalks 3. Build Second Water Tower 4. Build a Recreation Building with room for an Outdoor Pool or Aquatic Center 5. Upgrade to WWTP”
    document 2754, p. 4 · meeting · 2020s
  42. January 18, 2022 Report The goal-setting report lists these top near-term priorities: land for a joint public safety building with the county ambulance and EMA, an upgrade of North Park Road, a staffing plan, recruiting retail and hotels, and solar power for city facilities.
    “Purchase Land for Joint Public Safety Building with Johnson County Ambulance and EMA 2. Upgrade North Park Road 3. Review and Develop a Plan for additional Staffing Levels to address hiring needs 4. Develop a Plan to recruit more Retail/Hotel to Tiffin 5. Additional Solar Power for City Facilities”
    document 2754, p. 4 · meeting · 2020s
  43. May 3, 2022 Project Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52): Motion to approve Resolution No. 2022-044 – A Resolution for the Final Acceptance of the Roundabout Project, Tiffin, Iowa – Contractor – Rathje Construction by Schnedler document 178, p. 2 · meeting · Tiffin Roundabout (Park Road / Highway 6, STP-A-006-7(90)--22-52) · 2020s
  44. May 11, 2022 Report The minutes report that North Park Road would be 4 lanes with construction to begin in 2024.
    “North Park Road will be 4 lanes with construction to begin in 2024”
    document 177, p. 2 · meeting · project · 2020s
  45. May 17, 2022 Closure Resolution No. 2022-050 – A Resolution Approving the Closure of Main Street from Second Street to Third Street on Saturday, June 4, 2022, at 8:00 pm until 1:30 pm on Sunday, June 5, 2022, for the purpose of the Tiffin Fire Department’s Pancake Breakfast document 176, p. 3 · meeting · Res. 2022-050 · 2020s
  46. June 7, 2022 Project Permeable Paver Parking Project: Motion to approve Resolution No. 2022- 053 – A Resolution for the Final Acceptance of the Permeable Paver Parking Project, Tiffin, Iowa – Contractor – Nolan’s Lawn Care by Orris document 174, p. 3 · meeting · Permeable Paver Parking Project · 2020s
  47. August 2, 2022 Decision Ordinance 2022-497 amending Chapter 75, All-Terrain Vehicles, Off-Road Vehicles, and Snowmobiles was approved on first reading.
    “Ordinance No. 2022-497 – An Ordinance Amending the Municipal Code of Tiffin, Iowa, Chapter 75, All-Terrain Vehicles, Off-Road Vehicles, and Snowmobiles”
    document 170, p. 2 · meeting · Ord. 2022-497 · 2020s
  48. March 21, 2023 Annexation Resolution No. 2023-019 – A Resolution Approving the Annexation of Certain Property to the City of Tiffin, Iowa, located at 3287 Ireland Avenue NW document 154, p. 2 · meeting · Res. 2023-019 · 2020s
  49. March 21, 2023 Closure Resolution No. 2023-020 – A Resolution Approving the Closure of Main Street from Second Street to Third Street on Saturday, March 25, 2023, at 8:00 pm until 1:30 pm on Sunday, March 26, 2023, for the purpose of the Tiffin Emergency Responders’ Association Pancake Breakfast document 154, p. 2 · meeting · Res. 2023-020 · 2020s
  50. March 21, 2023 Resolution Resolution 2023-019 adopted: Approving the Annexation of Certain Property to the City of Tiffin, Iowa, located at 3287 Ireland Avenue NW document 154, p. 2 · meeting · Res. 2023-019 · 2020s
  51. March 21, 2023 Resolution Resolution 2023-020 adopted: Approving the Closure of Main Street from Second Street to Third Street on Saturday, March 25, 2023, at 8:00 pm until 1:30 pm on Sunday, March 26, 2023, for the purpose of the Tiffin Emergency Responders’ Association Pancake Breakfast document 154, p. 2 · meeting · Res. 2023-020 · 2020s
  52. May 16, 2023 Project Trails and sidewalks: I-4 Resolution No. 2023-034 – A Resolution for the Final Acceptance of the Madden Addition Pedestrian Bridge and Trail – Motion to approve as amended by Schnedler document 150, p. 3 · meeting · Trails and sidewalks · 2020s
  53. August 22, 2023 Milestone The administrator's report says the DOT ribbon cutting for the 80/380 Interchange Project was scheduled for Friday, August 25th at 10:00 a.m. on the closed Ramp E.
    “The DOT ribbon cutting for the 80/380 Interchange Project is scheduled for Friday, August 25th at 10:00 a.m. on the (closed) Ramp E”
    document 1024, p. 1 · meeting · 2020s
  54. September 5, 2023 Dedication The administrator's notes of September 5, 2023 refer to the ribbon cutting ceremony last Friday.
    “After the ribbon cutting ceremony last Friday I had another conversation with the Project Engineer with the DOT.”
    document 2159, p. 1 · meeting · 2020s
  55. December 5, 2023 Project Sidewalk Connection to Soccer Fields: Motion to approve Resolution No. 2023-081 – A Resolution to Award the Bid for the Sidewalk Connection to Soccer Fields Project by Orris document 130, p. 3 · meeting · Sidewalk Connection to Soccer Fields · 2020s
  56. February 5, 2024 Project Kimberlite Street – South Improvements: On the 5th day of February, 2024, at a regular meeting of the Tiffin City Council, Tiffin, Iowa, Councilperson Havens introduced RESOLUTION NO. 2024-015, A RESOLUTION TO AWARD BID FOR THE KIMBERLITE STREET – SOUTH IMPROVEMENTS PROJECT and made a motion to approve. Motion seconded by Councilperson Orris. Ayes: Limkemann, Havens, Olney, Orris, Schnedler. Nays: None. Absent: None. Whereupon five Coun document 7212 · meeting · Kimberlite Street – South Improvements · 2020s
  57. February 20, 2024 Spending At the hearing on a General Obligation loan agreement in a principal amount not to exceed $3,750,000, the clerk announced that no written objections were on file.
    “in a principal amount not to exceed $3,750,000, the City Clerk announced that no written objections had been placed on file”
    document 1943, p. 1 · meeting · 2020s
  58. March 5, 2024 Project Kimberlite Street – South Improvements: Motion to approve All American Concrete as general contractor on Resolution No. 2024-015 – A Resolution to Award the Bid for the Kimberlite Street – South Improvements Project by Havens document 123, p. 3 · meeting · Kimberlite Street – South Improvements · 2020s
  59. April 16, 2024 Closure Resolution No. 2024-023 – A Resolution Approving the Closure of Main Street from Second Street to Third Street on Saturday, May 4, 2024, at 8:00 pm until 1:30 pm on Sunday, May 5, 2024, for the purpose of the Tiffin Emergency Responders Association Pancake Breakfast document 118, p. 2 · meeting · Res. 2024-023 · 2020s
  60. April 16, 2024 Resolution Resolution 2024-023 adopted: Approving the Closure of Main Street from Second Street to Third Street on Saturday, May 4, 2024, at 8:00 pm until 1:30 pm on Sunday, May 5, 2024, for the purpose of the Tiffin Emergency Responders Association Pancake Breakfast document 118, p. 2 · meeting · Res. 2024-023 · 2020s
  61. May 7, 2024 Project Trails and sidewalks: K-5 Discussion and Consideration of Approval and Award of Bid for Rectangular Rapid Flashing Beacons (RRFB’s) at the Highway 6 and South Park Road Roundabout and Council Action as Needed – Motion to approve by Havens document 1271, p. 3 · meeting · Trails and sidewalks · 2020s
  62. May 30, 2024 Spending General Obligation Corporate Purpose Bonds (Capital Loan Notes), Series 2024A: $3,565,000, Original Town phase 3 streets, Kimberlite Street, fire and public works vehicles, North Park Road engineering
    “Resolution 2024-031: loan agreement, $3,565,000 Series 2024A”
    document 1814, p. 2 · meeting · Res. 2024-007 · 2020s
  63. June 18, 2024 Project Kimberlite Street – South Improvements: Motion to approve Resolution No. 2024-037 – A Resolution Approving the Substantial Completion of the Kimberlite Street – South Improvements Project by Limkemann document 112, p. 3 · meeting · Kimberlite Street – South Improvements · 2020s
  64. July 16, 2024 Special event Consideration of Special Events Application – Block Party for the 100 block of Summerhays Street, Ed Swim – Motion to Approve · meeting · 2020s
  65. August 16, 2024 Spending Financed purchase, 2013 street sweeper: $130,000, A used (2013) street sweeper · 2020s
  66. November 5, 2024 Project Kimberlite Street – South Improvements: Motion to approve Resolution 2024-070 – A Resolution for the Final Acceptance of the Kimberlite Street South Improvements Project, Tiffin, Iowa – Contractor – All American Concrete by Olney document 102, p. 2 · meeting · Kimberlite Street – South Improvements · 2020s
  67. January 7, 2025 Spending The resolution on the North Park Road Improvements Project states the Iowa DOT opened bids on December 19, 2024, and that Boomerang Corporation was identified as having the lowest, most responsible bid.
    “Iowa Department of Transportation has received and opened bids on December 19, 2024, for the North Park Road Improvements Project; and, Whereas, the City Council of the City of Tiffin has received the bidding information; and, Whereas, Boomerang Corporation has been identified as having the lowest, most responsible bid”
    document 1621, p. 1 · meeting · Res. 2025-002 · project · 2020s
  68. January 7, 2025 Project North Park Road Improvements (STP-U-7662(615)--70-52): Motion to approve Resolution 2025-002 – A Resolution to Award the Bid for the North Park Road Improvements Project by Olney document 98, p. 3 · meeting · North Park Road Improvements (STP-U-7662(615)--70-52) · 2020s
  69. January 21, 2025 History note The settlement: a roundabout, south Jasper Avenue, and $525,000
    “Within 30 days after execution of the releases and dismissals contemplated herein, Tiffin will pay Clint Rarick and the Trust $525,000 to reimburse them for a portion of their attorney’s fees incurred in the subject cases, and related litigation.”
    document 1592, p. 4 · meeting · Res. 2025-008 · history note · 2020s
  70. January 21, 2025 History note Where four jurisdictions meet at Forevergreen and Jasper
    “WHEREAS, the corporate boundary lines of County, North Liberty, Tiffin, and Coralville meet south of the intersection of Forevergreen Road and Jasper Avenue;”
    document 1594, p. 3 · meeting · Res. 2025-008 · history note · 2020s
  71. January 21, 2025 Neighbors Resolution 2025-008 – A Resolution to Approve the 28E Agreement between the City of North Liberty, the City of Tiffin, the City of Coralville, and Johnson County regarding Construction of a Roundabout at Jasper Avenue and Forevergreen Road document 97, p. 2 · meeting · Res. 2025-008 · 2020s
  72. January 21, 2025 Resolution Resolution 2025-008 adopted: To Approve the 28E Agreement between the City of North Liberty, the City of Tiffin, the City of Coralville, and Johnson County regarding Construction of a Roundabout at Jasper Avenue and Forevergreen Road document 97, p. 2 · meeting · Res. 2025-008 · 2020s
  73. January 21, 2025 Resolution Resolution 2025-009 adopted: Approving the 28E Agreement between the City of Tiffin and the City of Coralville regarding Construction of South Jasper Avenue document 97, p. 3 · meeting · Res. 2025-009 · 2020s
  74. February 4, 2025 Spending At the hearing on a General Obligation Corporate Purpose loan agreement in a principal amount not to exceed $5,500,000, the clerk announced that no written objections were on file; the loan is North Park Road's financing.
    “in a principal amount not to exceed $5,500,000, the City Clerk announced that no written objections had been placed on file”
    document 1572, p. 1 · meeting · project · 2020s
  75. February 4, 2025 Decision Ordinance 2024-518 amending Chapter 69, Parking Regulations, Section 69.09, Truck Parking Limited, was moved for third and final reading.
    “Ordinance 2024-518 – An Ordinance Amending the Municipal Code of Tiffin, Iowa, Chapter 69, Parking Regulations, Section 69.09, Truck Parking Limited a. Motion to Approval Third and Final Reading”
    document 95, p. 3 · meeting · Ord. 2024-518 · 2020s
  76. April 15, 2025 Closure Resolution No. 2025-040 – A Resolution Approving the Closure of Main Street for Tiffin First Responders Association Pancake Breakfast document 86, p. 3 · meeting · Res. 2025-040 · 2020s
  77. April 24, 2025 Spending General Obligation Corporate Purpose Bonds, Series 2025A: $5,350,000, North Park Road reconstruction
    “Resolution 2025-035: loan agreement, $5,350,000 Series 2025A”
    document 1473, p. 2 · meeting · Res. 2025-028 · 2020s
  78. May 6, 2025 Spending The council work session agreed to a six-year TIF agreement totaling $600,000 with a developer for the extension of East Village Drive to South Park Road, with the city also paying for water main upsizing, a retaining wall and widening the road from 36 feet to 40 feet.
    “Council agreed to a six-year agreement totaling $600,000. City will also pay for upsizing the water main, installation of a retaining wall and oversizing of the road from 36 feet to 40 feet”
    document 85, p. 1 · meeting · 2020s
  79. July 1, 2025 Project Forevergreen Road Earth Stockpile / Grading: K-8 Consideration of Accepting Bid from Cornerstone Excavating for the Earth Stockpile Spreading Project – Motion to approve by Olney document 1407, p. 5 · meeting · Forevergreen Road Earth Stockpile / Grading · 2020s
  80. September 2, 2025 Report The project update states that as of August 25, 2025 the south section of North Park Road, including the new roundabout at the bus loop, was open to traffic.
    “As of August 25th, 2025, the south section of North Park Road including the new roundabout at the Tiffin/Oak Hill Elementary School bus loop is open to traffic.”
    document 914, p. 3 · meeting · 2020s
  81. January 15, 2026 History note The roundabout is built
    “The City of North Liberty accepted the bid and authorized the execution of a contract with CJ Moyna & Sons, LLC, for the Forevergreen Road and Jasper Avenue Improvements Project (roundabout) at their January 20th City Council Meeting.”
    document 686, p. 1 · meeting · history note · 2020s
  82. May 19, 2026 Project Roberts Ferry Road & Village Drive Traffic Signal: I-3 Resolution No. 2026-036 – A Resolution to Award the Bid for the Village Drive and Roberts Ferry Road Traffic Signal Project – Motion to approve by Olney document 47, p. 3 · meeting · Roberts Ferry Road & Village Drive Traffic Signal · 2020s
  83. September 1, 2026 Figure A memo on the Iowa DOT agreement for the highway reconstruction states the city's estimated share is $3,920,988.98, mostly city-responsibility improvements plus a six-percent share of storm sewer costs.
    “The City's estimated share of $3,920,988.98 is comprised primarily of improvements that are the City's responsibility, along with the City's six-percent share of applicable storm sewer costs”
    document 297, p. 1 · meeting · project · 2020s
  84. October 6, 2026 Closure Resolution No. 2026-048 – A Resolution Approving the Closure of Main Street from Second Street to Third Street on Saturday, October 17, 2026, at 8:00 Pm Until 1:30 Pm on Sunday, October 18, 2026, for the Purpose of the Tiffin Emergency Responders Association Pancake Breakfast document 7508, p. 2 · meeting · Res. 2026-048 · 2020s
  85. October 6, 2026 Resolution Resolution 2026-048 adopted: Approving the Closure of Main Street from Second Street to Third Street on Saturday, October 17, 2026, at 8:00 Pm Until 1:30 Pm on Sunday, October 18, 2026, for the Purpose of the Tiffin Emergency Responders Association Pancake Breakfast document 7508, p. 2 · meeting · Res. 2026-048 · 2020s

Dates are the meeting's or the document's unless the page states another. Themes on ordinances, resolutions and project milestones come from words in their titles (a rule, not a reading); on notes and claims, from the research.

Data last updated October 23, 2026. Built from the archive's documents; see how the data is built.