contract agreement · K-2
Discussion and Consideration to Approve a Professional Service Agreement with the Iowa DOT for the Highway 6 Improvements Project – Motion to Approve — K-2
Page 1 of 13
Text from the PDF text layer; check the PDF for anything that matters. AGENDA ITEM # K-2
AGENDA INFORMATION
TIFFIN CITY COUNCIL COMMUNICATION
DATE: August 27, 2026
AGENDA ITEM: Discussion and Consideration to Approve a Professional Service Agreement
with the Iowa DOT for the Highway 6 Improvements Project
ACTION: Motion
Background
The Iowa Department of Transportation and the City of Tiffin have been working jointly on
improvements to U.S. 6 through Tiffin. The City and Iowa DOT previously entered into
Agreement No. 2025-P-001 for predesign, which was executed by the City on March 7, 2025,
and by the Iowa DOT on March 17, 2025. The proposed Preconstruction Agreement establishes
the current project concept and identifies the responsibilities and cost-sharing obligations of both
parties.
In addition to the primary highway improvements, the City has requested that the project
incorporate several improvements within Tiffin, including:
• New storm sewer and associated appurtenances;
• New water main and associated appurtenances;
• Sidewalk improvements;
• Traffic signals at the intersection of U.S. 6 and Kimberlite Street;
• Widening of U.S. 6 pavement; and
• Extension of an existing box culvert.
These City-requested improvements will be incorporated into the Iowa DOT project and
constructed as part of the overall project. The agreement provides that these requested
improvements will be at no cost to the Iowa DOT beyond the City's identified cost-share
responsibilities.
Under the agreement, the City will have several responsibilities associated with the project. The
City will assist the Iowa DOT with inspection of the new water main and associated
appurtenances. The City will also assume ownership and future maintenance responsibilities for
the new water mains, traffic signals within the City's corporate boundaries, PCC sidewalks
located outside Iowa DOT right-of-way, and the reconstructed portions of Main Street,
Summerhays Street, Stephans Street, Croell Avenue, and Kimberlite Street.
The City will also be responsible for relocating City-owned utilities when necessary for
construction and for providing certain City-owned property or right-of-way required for the
project. The agreement specifically provides temporary access to City-owned property near the
Park Road roundabout for construction of the new water main.
The City's estimated share of $3,920,988.98 is comprised primarily of improvements that are the
City's responsibility, along with the City's six-percent share of applicable storm sewer costs.
Exhibit B identifies the project costs by division, with Division 1 funded 100% by the Iowa
1
Sources
- revize: K-2 (Mm9BMoO5BW2h22YZFjfwxwGHtYxkLP.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-2 Discussion and Consideration to Approve a Professional Service Agreement with the Iowa...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.