contract agreement · K-2
Discussion and Consideration to Approve a Professional Service Agreement with the Iowa DOT for the Highway 6 Improvements Project – Motion to Approve — K-2
Page 13 of 13
Text read by the vision model; check the PDF for anything that matters.TRENCHLESS, POLYVINYL CHLORIDE PIPE (PVC), 8 IN.
4" HP GAS LINE CROSSING.
CONTRACTOR TO COORDINATE WITH RENAISSANCE GAS FOR CONSTRUCTION PRIOR TO WATER MAIN CONSTRUCTION.
NOTE: HYDRANTS TO BE LOCATED 4' MIN. FROM BACK OF CURB AND 2' FROM EDGE OF SIDEWALK
EXISTING 12" WATER MAIN WITH 24" STEEL CASING
CONNECT INTO EXISTING 12 IN. WATER MAIN, TEE, DIP, 12 IN. X 8 IN., FIELD VERIFY DEPTH
EXISTING HYDRANT
FLUSHING DEVICE (BLOWOFF), 8 IN.
VALVE, GATE, DIP, 8 IN.
45-DEGREE BEND, DIP, 8 IN.
TEE, DIP, 8 IN. X 8 IN.
EXISTING 12" WATER MAIN
EXISTING HYDRANT
EXISTING GROUND OVER WATER MAIN
CONNECT INTO EXISTING 12 IN. WATER MAIN
TEE, DIP, 32 IN. X 8 IN.
STA 215+53.00, 94.5° RT
FIELD VERIFY DEPTH
45-DEGREE BEND, DIP, 8 IN.
STA 215+48.20, 99.5° RT
VALVE, GATE, DIP, 8 IN.
STA 215+45.60, 90° RT
WATER MAIN, TRENCHLESS, POLYVINYL CHLORIDE PIPE (PVC), 8 IN.
11.25-DEGREE BEND, DIP, 8 IN.
STA 215+48+40, 102.1° RT
FLUSHING DEVICE (BLOWOFF), 8 IN.
STA 215+40.00, 100.2° RT
435 LF TRENCHLESS
Sources
- revize: K-2 (Mm9BMoO5BW2h22YZFjfwxwGHtYxkLP.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-2 Discussion and Consideration to Approve a Professional Service Agreement with the Iowa...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.