contract agreement · K-2

Discussion and Consideration to Approve a Professional Service Agreement with the Iowa DOT for the Highway 6 Improvements Project – Motion to Approve — K-2

Dated September 1, 2026City Council — regular meeting, September 1, 2026 13 pages

Open the PDF Searchable (OCR) PDF

Page 13 of 13

Text read by the vision model; check the PDF for anything that matters.
TRENCHLESS, POLYVINYL CHLORIDE PIPE (PVC), 8 IN. 4" HP GAS LINE CROSSING. CONTRACTOR TO COORDINATE WITH RENAISSANCE GAS FOR CONSTRUCTION PRIOR TO WATER MAIN CONSTRUCTION. NOTE: HYDRANTS TO BE LOCATED 4' MIN. FROM BACK OF CURB AND 2' FROM EDGE OF SIDEWALK EXISTING 12" WATER MAIN WITH 24" STEEL CASING CONNECT INTO EXISTING 12 IN. WATER MAIN, TEE, DIP, 12 IN. X 8 IN., FIELD VERIFY DEPTH EXISTING HYDRANT FLUSHING DEVICE (BLOWOFF), 8 IN. VALVE, GATE, DIP, 8 IN. 45-DEGREE BEND, DIP, 8 IN. TEE, DIP, 8 IN. X 8 IN. EXISTING 12" WATER MAIN EXISTING HYDRANT EXISTING GROUND OVER WATER MAIN CONNECT INTO EXISTING 12 IN. WATER MAIN TEE, DIP, 32 IN. X 8 IN. STA 215+53.00, 94.5° RT FIELD VERIFY DEPTH 45-DEGREE BEND, DIP, 8 IN. STA 215+48.20, 99.5° RT VALVE, GATE, DIP, 8 IN. STA 215+45.60, 90° RT WATER MAIN, TRENCHLESS, POLYVINYL CHLORIDE PIPE (PVC), 8 IN. 11.25-DEGREE BEND, DIP, 8 IN. STA 215+48+40, 102.1° RT FLUSHING DEVICE (BLOWOFF), 8 IN. STA 215+40.00, 100.2° RT 435 LF TRENCHLESS

Sources

Attached to agenda item: K-2 Discussion and Consideration to Approve a Professional Service Agreement with the Iowa...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.