Every dated item of the town's history in the archive on one list: history notes, checked research claims, events read from the records, ordinances, resolutions of the kinds that mark the town's life, project milestones, the earliest appointment to each board and proclamations. Each line is as the records put it, with its page. Atom feed.

577 items match.

  1. September 4, 2019 Spending General Obligation Corporate Purpose Bonds, Series 2019A: $4,500,000, Streets, water, sewer and storm sewer
    “Resolution 2019-096 (bond purchase and levy)”
    document 6809, p. 1 · meeting · Res. 2019-096 · 2010s
  2. December 17, 2019 Ordinance Ordinance 2019-464 adopted: Amending the Municipal Code of Tiffin, Chapter 91, Water Meters, Sections 91.06 and 91.09 document 5103 · meeting · Ord. 2019-464 · 2010s
  3. June 16, 2020 Project 2019 Storm Water Rehabilitation Projects: Motion to approve Resolution 2020- 054 – A Resolution for the Final Acceptance of the Stormwater Rehabilitation Project, Tiffin, Iowa – Contractor – Triple B Construction by Havens document 235, p. 3 · meeting · 2019 Storm Water Rehabilitation Projects · 2020s
  4. August 4, 2020 Decision The council approved a water tower inspection proposal.
    “Motion to approve Water Tower Inspection Proposal by Schnedler Second by Bartels All ayes, motion carried.”
    document 232, p. 3 · meeting · project · 2020s
  5. August 25, 2020 Spending General Obligation Urban Renewal and Refunding Bonds, Series 2020A: $7,670,000, Phase II streets, a water well, the public works building, a sewer main, and refunding Series 2012A
    “Resolution 2020-063: $7,670,000 Series 2020A”
    document 6896, p. 3 · 2020s
  6. October 6, 2020 Decision A resolution states the city recognized the need to separate water and wastewater duties from the Public Works Director position because of growth of both departments.
    “recognizes the need to separate the Water and Wastewater duties from the Public Works Director’s position due to growth of both departments”
    document 6910, p. 1 · Brett Mehmen · 2020s
  7. December 1, 2020 Report The capital improvements discussion records North Park Road urbanization in 2024-2025, a new water tower in 2025-2026 and the next GO Bond possibly in summer of 2023.
    “Summer of 2023 could be the next GO Bond. Sanitary Sewer Interceptor Line pushed out another year. Trail Phase 7 could be moved up 1 year as that project will start yet this year. Recreation Center would depend on when to start a Capital Campaign. North Park Road urbanize the road in 2024-2025. New water tower in 2025-2026”
    document 223, p. 1 · meeting · 2020s
  8. January 19, 2021 Figure An official statement of January 2021 lists three SRF revenue bonds, a water bond of $340,000 and sewer bonds of $2,296,000 and $6,754,000, all at 1.75%.
    “Original Amount: $340,000 $2,296,000 $6,754,000 Maturity: 1-Jun 1-Jun 1-Jun TOTAL TOTAL Interest Rates: 1.75% 1.75% 1.75%”
    document 1353, p. 29 · 2020s
  9. June 15, 2021 Figure The salary resolution lists Brett Mehmen at $3,113.97 per pay period.
    “Brett Mehmen $3,113.97/ppd”
    document 6978, p. 1 · Brett Mehmen · 2020s
  10. October 5, 2021 Decision The council approved Resolution 2021-055 awarding the bid for the Tiffin Well #5 test well project.
    “Resolution No. 2021-055 – A Resolution to Award the Bid for the Tiffin Water Well #5 Test Well Improvements. Motion to approve Resolution No. 2021-055 – A Resolution to Award the Bid for the Tiffin Water Well #5 Test Well Improvements by Limkemann. Second by Schnedler. Roll Call: Bartels, Havens, Olney, Schnedler, Limkemann. All ayes, motion carried”
    document 198, p. 3 · meeting · Res. 2021-055 · project · 2020s
  11. October 5, 2021 Project Test Well Improvements: Motion to approve Resolution No. 2021-055 – A Resolution to Award the Bid for the Tiffin Water Well #5 Test Well Improvements by Limkemann document 198, p. 3 · meeting · Test Well Improvements · 2020s
  12. October 5, 2021 Project Well #5 (test well, pump, controls and water main): Motion to approve Resolution No. 2021-055 – A Resolution to Award the Bid for the Tiffin Water Well #5 Test Well Improvements by Limkemann document 198, p. 3 · meeting · Well #5 (test well, pump, controls and water main) · 2020s
  13. October 19, 2021 Ordinance Ordinance 2021-480 adopted: Amending the Municipal Code of Tiffin, Iowa, Section 92.08 of Chapter 92, to Increase the Water Deposit Amount document 5118 · meeting · Ord. 2021-480 · 2020s
  14. November 16, 2021 Report The urban renewal annual report lists the new 500,000 gallon water tower as physically complete, with payments not complete.
    “water tower Description: new 500,000 gallon water tower Classification: Water treatment plants, waste treatment plants & lagoons Physically Complete: Yes Payments Complete: No”
    document 2846, p. 4 · 2020s
  15. December 7, 2021 Decision Ordinance 2021-483 amended Section 92.02 of Chapter 92, Rates for Service, Bulk Water; the third and final reading was moved at this meeting.
    “Ordinance No. 2021-483 – An Ordinance Amending the Municipal Code of Tiffin, Iowa, Section 92.02 of Chapter 92, Rates for Service, Bulk Water”
    document 2804, p. 2 · meeting · Ord. 2021-483 · 2020s
  16. December 7, 2021 Figure Ordinance 2021-483 changed the bulk water flow rate from $8.25 to $10.50 (printed as $0.0105 per gallon).
    “Flow Rate - $8.25 $10.50 – equal to $0.00825 $0.0105 per gallon”
    document 7016, p. 1 · Ord. 2021-483 · 2020s
  17. January 18, 2022 Report The goal-setting report lists these long-term priorities: conversion of the water treatment plant to reverse osmosis, urbanization of Highway 6, a second water tower, a recreation building with room for an outdoor pool or aquatic center, and a WWTP upgrade.
    “Improve Water Quality – Conversion of Water Treatment Plant to Reverse Osmosis (Implementation) 2. Urbanization of Highway 6/Sidewalks 3. Build Second Water Tower 4. Build a Recreation Building with room for an Outdoor Pool or Aquatic Center 5. Upgrade to WWTP”
    document 2754, p. 4 · meeting · 2020s
  18. June 21, 2022 Figure The salary resolution lists Brett Mehmen at $3,303.01 per pay period.
    “Brett Mehmen $3,303.01/ppd”
    document 7073, p. 1 · Brett Mehmen · 2020s
  19. August 2, 2022 Decision The council approved Resolution 2022-067 awarding the bid for the Well #5 Pump, Controls and Watermain Project.
    “Resolution No. 2022-067 – A Resolution to Award the Bid for the Well #5 Pump, Controls and Watermain Project. Motion to approve Resolution No. 2022-067 – A Resolution to Award the Bid for the Well #5 Pump, Controls and Watermain Project by Havens. Second by Schnedler. Roll Call: Havens, Schnedler, Limkemann, Orris, Olney. All ayes, motion carried”
    document 170, p. 2 · meeting · Res. 2022-067 · project · 2020s
  20. August 2, 2022 Project Well #5 (test well, pump, controls and water main): Motion to approve Resolution No. 2022-067 – A Resolution to Award the Bid for the Well #5 Pump, Controls and Watermain Project by Havens document 170, p. 2 · meeting · Well #5 (test well, pump, controls and water main) · 2020s
  21. November 1, 2022 Figure The minutes record that MSA recommended reverse osmosis with a pilot program, estimated at $2,500,000-$3,000,000.
    “MSA recommended reverse osmosis and a pilot program be done prior to ensure accuracy during construction if the City chooses. This was estimated at $2,500,000-$3,000,000”
    document 163, p. 1 · meeting · project · 2020s
  22. November 15, 2022 Decision The council approved a professional services agreement with MSA for a comprehensive water system evaluation.
    “Professional Services Agreement with MSA Professional Services for a Comprehensive Water System Evaluation and Council Action as Needed. Motion to approve by Limkemann. Second by Orris. All ayes, motion carried.”
    document 162, p. 3 · meeting · project · 2020s
  23. June 20, 2023 Figure The salary resolution lists Brett Mehmen at $3,495.09 per pay period.
    “Brett Mehmen $3,495.09/ppd”
    document 2253, p. 1 · Brett Mehmen · 2020s
  24. December 5, 2023 Report A city clerk's certificate states that the City established the Municipal Waterworks Utility System prior to January 1, 1961 and has operated it continuously since.
    “I further certify that the City established the Municipal Waterworks Utility System (the "Utility") prior to January 1, 1961, and that the Utility has been in continuous operation by the City since its establishment as aforesaid in supplying water service to the City and its inhabitants.”
    document 7189, p. 6 · Res. 2023-078 · 2020s
  25. December 19, 2023 Decision The council approved a professional services agreement proposal from MSA Professional Services for the Reverse Osmosis Water Treatment Plant design.
    “Professional Services Agreement Proposal from MSA Professional Services, Inc., for the Reverse Osmosis Water Treatment Plant Design and Council Action as Needed. Motion to approve by Limkemann. Second by Schnedler. All ayes, motion carried”
    document 129, p. 3 · meeting · project · 2020s
  26. December 19, 2023 Figure The reverse osmosis design scope states the ultimate capacity of the water treatment plant at approximately 4 MGD, with a proposed 400,000-gallon clear well in two 200,000-gallon tanks.
    “MGD and the ultimate capacity of the water treatment plant will be approximately 4 MGD. The proposed 400,000-gallon clear well will be sectioned into two 200,000-gallon storage tanks to facilitate maintenance of tanks.”
    document 2015, p. 3 · 2020s
  27. December 19, 2023 Spending Resolution No. 2023-085 – A Resolution taking Additional Action with respect to a Water Revenue Loan and Disbursement Agreement and Authorizing, Approving and Securing the Payment of a $143,774 Water Revenue Loan and Disbursement Agreement Anticipation Project Note (IFA Interim Loan and … document 129, p. 3 · meeting · Res. 2023-085 · 2020s
  28. January 5, 2024 Spending Water Revenue Loan and Disbursement Agreement Anticipation Project Note, Series 2024 (SRF planning and design loan): $143,774, Planning and design of the water treatment plant
    “Dated 01/05/24, $143,774, principal due fiscal 2027”
    document 1521, p. 29 · 2020s
  29. March 5, 2024 Decision A public hearing was held on Ordinance 2024-508 amending Chapter 92 on billing for water service, late payment and service discontinued fees.
    “Ordinance No. 2024-508 – An Ordinance Amending the Municipal Code of Tiffin, Iowa, Chapter 92, Section 92.03(3) Billing for Water Service, Late Payment and Section 92.04(4)(a) Service Discontinued, Fees”
    document 123, p. 2 · meeting · Ord. 2024-508 · 2020s
  30. March 19, 2024 Decision For customers who had not recognized the full benefit of a single-purpose meter purchase price through relief of the sewer rate, the city would make up the difference as a credit.
    “For customers who haven’t recognized the full benefit of the meter purchase price through the relief of the sewer rate, the City will make up the difference in the form of a credit on”
    document 3447, p. 2 · meeting · 2020s
  31. June 18, 2024 Figure The salary resolution lists Brett Mehmen at $4,089.83 per pay period.
    “Brett Mehmen $4,089.83/ppd”
    document 7233, p. 1 · Brett Mehmen · 2020s
  32. June 18, 2024 Figure The pay resolution lists Jacob Wessling at $26.22 per hour.
    “Jacob Wessling $26.22/hr”
    document 7233, p. 1 · Jacob Wessling · 2020s
  33. August 6, 2024 Decision The council approved Resolution 2024-050 awarding the bid for the water treatment plant upgrade electrical equipment procurement, a standby generator and ATS.
    “Motion to approve Resolution No. 2024-050 – A Resolution to Award the Bid for the Water Treatment Plant Upgrade – Electrical Equipment Procurement – Standby Generator and ATS”
    document 109, p. 4 · meeting · Res. 2024-050 · project · 2020s
  34. August 6, 2024 Project Water Treatment Plant Upgrades: Motion to approve Resolution No. 2024-050 – A Resolution to Award the Bid for the Water Treatment Plant Upgrade – Electrical Equipment Procurement – Standby Generator and ATS by Limkemann document 109, p. 4 · meeting · Water Treatment Plant Upgrades · 2020s
  35. August 6, 2024 Project Water Treatment Plant Upgrades: Motion to approve Resolution No. 2024-051 – A Resolution to Award the Bid for the Water Treatment Plant Upgrade – Electric Equipment Procurement – Electrical Equipment and Controls By Havens document 109, p. 4 · meeting · Water Treatment Plant Upgrades · 2020s
  36. August 20, 2024 Decision The council approved Resolution 2024-055 giving final acceptance of the Well #5 Improvements Project, contractor Shawver Well Company.
    “Motion to approve Resolution No. 2024-055 – A Resolution for the Final Acceptance of the Well #5 Improvements Project, Tiffin, Iowa – Contractor – Shawver Well Company”
    document 108, p. 2 · meeting · Res. 2024-055 · project · 2020s
  37. August 20, 2024 Project Well #5 (test well, pump, controls and water main): Motion to approve Resolution No. 2024-055 – A Resolution for the Final Acceptance of the Well #5 Improvements Project, Tiffin, Iowa – Contractor – Shawver Well Company by Limkemann document 108, p. 2 · meeting · Well #5 (test well, pump, controls and water main) · 2020s
  38. November 19, 2024 Proclamation The council agenda lists a mayoral Proclamation of Recognition for a city employee.
    “Proclamation of Recognition for Brett Mehmen”
    document 101, p. 2 · meeting · Brett Mehmen · 2020s
  39. December 17, 2024 Discussion Among items discussed as possible budget items at the December 17, 2024 meeting was evaluating water and sewer rates.
    “council chambers audio/video and refresh and evaluating water and sewer rates.”
    document 99, p. 1 · meeting · 2020s
  40. January 21, 2025 Milestone The council approved Resolution 2025-012 approving substantial completion of the Well #5 Pump, Controls and Watermain Project.
    “Resolution No. 2025-012 – A Resolution Approving the Substantial Completion of the Well #5 Pump, Controls and Watermain Project. Motion to approve Resolution No. 2025-012 – A Resolution Approving the Substantial Completion of the Well #5 Pump, Controls and Watermain Project by Limkemann. Second by Orris. Roll Call: Orris, Olney, Schnedler, Limkemann, Havens. All ayes, motion carried”
    document 97, p. 3 · meeting · Res. 2025-012 · project · 2020s
  41. January 21, 2025 Project Well #5 (test well, pump, controls and water main): Motion to approve Resolution No. 2025-012 – A Resolution Approving the Substantial Completion of the Well #5 Pump, Controls and Watermain Project by Limkemann document 97, p. 3 · meeting · Well #5 (test well, pump, controls and water main) · 2020s
  42. March 10, 2025 Decision The council approved Resolution 2025-025 giving notice of the proposed plans, specifications and estimate of cost for the Water Treatment Plant Upgrades Project and the taking of bids.
    “Motion to approve Resolution No. 2025-025 – A Resolution to provide for a Notice on Proposed Plans, Specifications, Form of Contract and Estimate of Cost for the Water Treatment Plant Upgrades Project, and the taking of Bids therefor”
    document 91, p. 1 · meeting · Res. 2025-025 · project · 2020s
  43. April 15, 2025 Discussion A council agenda item of April 15, 2025 was titled Proposed Water (and Sewer) Rate Structure Increase for the Water Treatment Plant Upgrade Project.
    “Discussion and Review of Proposed Water (and Sewer) Rate Structure Increase for the Water Treatment Plant Upgrade Project”
    document 86, p. 1 · meeting · 2020s
  44. April 15, 2025 Decision The council approved Resolution 2025-038 considering the bids and awarding the contract for the Water Treatment Plant Upgrades Project.
    “Resolution No. 2025-038 – A Resolution Considering the Bids and Awarding the Contract for the Water Treatment Plant Upgrades Project. Motion to approve Resolution No. 2025-038 – A Resolution Considering the Bids and Awarding the Contract for the Water Treatment Plant Upgrades Project by Orris. Second by Schnedler. Roll Call: Olney, Schnedler, Havens, Orris. All ayes, motion carried”
    document 86, p. 3 · meeting · Res. 2025-038 · project · 2020s
  45. April 15, 2025 Spending The award resolution for the Water Treatment Plant Upgrades Project lists Tricon Construction Group, Cedar Rapids, at an amount of bid of $12,182,553.00.
    “Tricon Construction Group<br>746 58th Ave Ct SW<br>Cedar Rapids, IA 52404</td> <td>$12,182,553.00”
    document 7317, p. 2 · Res. 2025-038 · project · 2020s
  46. April 15, 2025 Project Water Treatment Plant Upgrades: Motion to approve Resolution No. 2025-038 – A Resolution Considering the Bids and Awarding the Contract for the Water Treatment Plant Upgrades Project by Orris document 86, p. 3 · meeting · Water Treatment Plant Upgrades · 2020s
  47. May 6, 2025 Report A city clerk's certificate in the May 2025 water revenue loan papers states that the City established the Municipal Waterworks Utility System prior to January 1, 1961 and has operated it continuously since.
    “I further certify that the City established the Municipal Waterworks Utility System (the “Utility”) prior to January 1, 1961, and that the Utility has been in continuous operation by the City since its establishment as aforesaid in supplying water service to the City and its inhabitants.”
    document 1440, p. 5 · meeting · 2020s
  48. May 6, 2025 Spending The council set a public hearing on a proposal to enter into a Water Revenue Loan and Disbursement Agreement for a principal amount not to exceed $15,000,000.
    “Public Hearing on proposal to enter into a Water Revenue Loan and Disbursement Agreement and to Borrow Money thereunder in a Principal amount not to exceed $15,000,000”
    document 85, p. 2 · meeting · Res. 2025-046 · project · 2020s
  49. May 6, 2025 Decision The council selected Option One for the water rate increase: a $15 base rate and usage fees of $5.75 per 1,000 gallons in FY2026, $7.85 in FY2027 and $10.15 in FY2028.
    “selected Option One. This option includes a $15 base rate and a graduated increase to the usage fee as follows: $5.75 per 1,000 gallons in FY2026, $7.85 in FY2027, and $10.15 in FY2028”
    document 85, p. 1 · meeting · project · 2020s
  50. May 6, 2025 Resolution Resolution 2025-047 adopted: Approving the Contract and Performance and/or Payment Bonds for the Water Treatment Plant Upgrades Project document 7326 · meeting · Res. 2025-047 · 2020s
  51. May 20, 2025 Decision The council approved Resolution 2025-055 setting June 3, 2025 for a public hearing to increase the water rate structure for the Water Treatment Plant Upgrade Project.
    “Motion to approve Resolution No. 2025-055 – A Resolution Setting the Date of June 3, 2025, for a Public Hearing to Increase Water Rate Structure for the City of Tiffin for the Water Treatment Plant Upgrade Project”
    document 1002, p. 3 · meeting · Res. 2025-055 · project · 2020s
  52. June 3, 2025 Decision The council closed the public hearing to increase the water rate structure for the Water Treatment Plan Upgrade Project and held the first reading of Ordinance No. 2025-520 amending Section 92.02, Rates for Service.
    “Water Rate Structure for the City of Tiffin, for the Water Treatment Plan Upgrade Project by Olney. Second by Orris. Roll Call: Limkemann, Havens, Orris, Olney, Schnedler. All ayes, motion carried. H. Ordinance Approval/Amendment 1. Ordinance No. 2025-520 – An Ordinance Amending the Municipal Code of Tiffin, Iowa, Section 92.02 of Chapter 92, Rates for Service”
    document 83, p. 3 · meeting · Ord. 2025-520 · project · 2020s
  53. July 1, 2025 Figure Ordinance 2025-520 raised the inside-city base rate from $7.00 to $15.00 per month, effective July 1, 2025.
    “Base Rate - $7.00 $15.00 per month”
    document 5158, p. 1 · Ord. 2025-520 · 2020s
  54. July 1, 2025 Figure The base rate of $15.00 per month set from July 1, 2025 is 150 percent above the $6.00 minimum bill of 1969 (derived). Derived
    “Base Rate - $7.00 $15.00 per month”
    document 5158, p. 1 · 2020s
  55. July 1, 2025 Figure The water rate schedule effective July 1, 2025 set the base rate at $15.00 a month, up from $7.00.
    “Water Rate Schedule Effective July 1, 2025: • Base Rate: $15.00/month (up from $7.00)”
    document 984, p. 1 · meeting · 2020s
  56. July 1, 2025 Figure Ordinance 2025-520 raised the flow rate from $5.50 to $5.75 per 1000 gallons, effective July 1, 2025.
    “Flow Rate - $5.50 – $5.75 per 1000 gallons, equal to $0.0055 $0.00575 per gallon”
    document 5158, p. 1 · Ord. 2025-520 · 2020s
  57. July 1, 2025 Figure The flow rate effective July 1, 2027 was $10.15 per 1,000 gallons.
    “Effective July 1, 2027: • Base Rate: $15.00/month • Flow Rate: $10.15 per 1,000 gallons”
    document 984, p. 1 · meeting · 2020s
  58. July 1, 2025 Figure The flow rate effective July 1, 2025 was $5.75 per 1,000 gallons.
    “Water Rate Schedule Effective July 1, 2025: • Base Rate: $15.00/month (up from $7.00) • Flow Rate: $5.75 per 1,000 gallons”
    document 984, p. 1 · meeting · 2020s
  59. July 1, 2025 Figure The flow rate effective July 1, 2026 was $7.85 per 1,000 gallons.
    “Effective July 1, 2026: • Base Rate: $15.00/month • Flow Rate: $7.85 per 1,000 gallons”
    document 984, p. 1 · meeting · 2020s
  60. July 1, 2025 Decision The agenda communication for the water rate ordinance gives the base rate as $15.00 per month, up from $7.00, and a flow rate of $5.75 per 1,000 gallons.
    “Base Rate: $15.00/month (up from $7.00) • Flow Rate: $5.75 per 1,000 gallons”
    document 984, p. 1 · meeting · Ord. 2025-520 · 2020s
  61. July 1, 2025 Figure The salary resolution lists Brett Mehmen at $4,397.39 per pay period.
    “Brett Mehmen $4,397.39/ppd”
    document 7346, p. 1 · Brett Mehmen · 2020s
  62. July 1, 2025 Figure The pay resolution lists Jacob Wessling at $27.72 per hour.
    “Jacob Wessling $27.72/hr”
    document 7346, p. 1 · Jacob Wessling · 2020s
  63. July 1, 2025 Figure A change order form for the Water Treatment Plant upgrade prints substantial completion of 9/30/26 and ready for final payment of 11/30/26.
    “Substantial Completion: 9/30/26<br>Ready for final payment: 11/30/26”
    document 993, p. 1 · project · 2020s
  64. August 19, 2025 Spending Resolution 2025-074 authorized a Loan and Disbursement Agreement for $14,384,000 Water Revenue Bonds, Series 2025 through the Iowa SRF program.
    “Resolution 2025-074 – Resolution authorizing and approving a Loan and Disbursement Agreement and providing for the issuance and securing the payment of $14,384,000 Water Revenue Bonds, Series 2025”
    document 927, p. 1 · meeting · Res. 2025-074 · project · 2020s
  65. August 19, 2025 Figure The $14,384,000 Water Revenue Bonds of 2025 is about $15,000,000 in 2026 dollars. Derived
    “Resolution 2025-074 – Resolution authorizing and approving a Loan and Disbursement Agreement and providing for the issuance and securing the payment of $14,384,000 Water Revenue Bonds, Series 2025”
    document 927, p. 1 · meeting · 2020s
  66. August 19, 2025 Spending Water Revenue Bonds, Series 2025 (SRF loan and disbursement agreement): $14,384,000, Water treatment plant upgrades (reverse osmosis)
    “Resolution 2025-074: loan and disbursement agreement, $14,384,000 Water Revenue Bonds, Series 2025”
    document 927, p. 1 · meeting · Res. 2025-074 · 2020s
  67. August 19, 2025 Resolution Resolution 2025-074 adopted: Resolution authorizing and approving a Loan and Disbursement Agreement and providing for the issuance and securing the payment of $14,384,000 Water Revenue Bonds, Series 2025 document 7353 · meeting · Res. 2025-074 · 2020s
  68. July 1, 2026 Figure Ordinance 2025-520 sets the flow rate at $7.85 per 1000 gallons effective July 1, 2026.
    “Flow Rate - $7.85 per 1000 gallons, equal to $0.00785 per gallon”
    document 5158, p. 1 · Ord. 2025-520 · 2020s
  69. July 7, 2026 Figure The pay-period salary listed for Brett Mehmen rose 51 percent, from $3,113.97 in the first of the resolutions listed to $4,712.12 in the July 2026 one (derived). Derived
    “Brett Mehmen $4,712.12/ppd”
    document 7412, p. 1 · Brett Mehmen · 2020s
  70. July 7, 2026 Figure The salary resolution lists Brett Mehmen at $4,712.12 per pay period.
    “Brett Mehmen $4,712.12/ppd”
    document 7412, p. 1 · Brett Mehmen · 2020s
  71. July 7, 2026 Figure The pay resolution lists Jacob Wessling at $29.25 per hour.
    “Jacob Wessling $29.25/hr”
    document 7412, p. 1 · Jacob Wessling · 2020s
  72. July 21, 2026 Figure A June 2026 MSA estimate for a wellhouse and well prints a construction sub-total of $886,200, construction with contingencies of $1,063,440 and a project total of $1,238,940.
    “Construction Sub-Total $ 886,200 Construction Contingencies (20%) $ 177,240 Construction Subtotal $ 1,063,440 Legal $7,500 Engineering Design $84,000 Engineering Construction $84,000 Project Total Estimate $ 1,238,940”
    document 374, p. 1 · project · 2020s
  73. September 1, 2026 Figure A memo on the Iowa DOT agreement for the highway reconstruction states the city's estimated share is $3,920,988.98, mostly city-responsibility improvements plus a six-percent share of storm sewer costs.
    “The City's estimated share of $3,920,988.98 is comprised primarily of improvements that are the City's responsibility, along with the City's six-percent share of applicable storm sewer costs”
    document 297, p. 1 · meeting · project · 2020s
  74. September 10, 2026 Figure A September 2026 agenda memo states the SRF Planning and Design loan for the Water Treatment Plant project has an approved amount of $143,774.00.
    “The loan has an approved amount of $143,774.00.”
    document 265, p. 1 · 2020s
  75. September 15, 2026 Decision The council approved a professional services agreement with MSA for the design of Well #6.
    “Well #6 and Council Action as Needed. Motion to approve by Orris. Second by Limkemann. All ayes, motion carried.”
    document 8, p. 3 · meeting · project · 2020s
  76. July 1, 2027 Figure Ordinance 2025-520 sets the flow rate at $10.15 per 1000 gallons effective July 1, 2027.
    “Flow Rate - $10.15 per 1000 gallons, equal to $0.01015 per gallon”
    document 5158, p. 1 · Ord. 2025-520 · 2020s
  77. July 1, 2027 Figure The flow rate printed for July 1, 2027 ($10.15 per 1000 gallons) is 238 percent above the $3.00 per 1,000 gallons set in 1986 (derived). Derived
    “Flow Rate - $10.15 per 1000 gallons, equal to $0.01015 per gallon”
    document 5158, p. 1 · 2020s

Dates are the meeting's or the document's unless the page states another. Themes on ordinances, resolutions and project milestones come from words in their titles (a rule, not a reading); on notes and claims, from the research.

Data last updated October 23, 2026. Built from the archive's documents; see how the data is built.