resolution
Resolutions-1997-021
Page 86 of 96
Text read by the vision model; check the PDF for anything that matters.11 – TRAFFIC CONTROL SIGNALS
11.01 APPROVALS, PERMITS, AS-BUILTS AND MAINTENANCE BONDS
A. Plans and specifications for traffic control signals must be certified by a professional engineer registered in the State of Iowa.
B. Plans and specifications for traffic control signals must be reviewed and approved by the City Engineer prior to construction.
C. Other local, state and federal permits may be required, depending on the circumstances. It shall be the responsibility of the Engineer of Record to acquire all applicable permits. A copy of all permits shall be provided to the City Engineer before construction.
D. The Engineer of Record is responsible to submit "Record of Construction" drawings to the City on reproducible vellum or mylar.
E. A five-year maintenance bond covering defective materials and workmanship is required for all traffic control signals.
11.02 DESIGN
A. Warrants for traffic control signals shall be as defined in the "Manual on Uniform Traffic Control Devices", current edition.
B. Design of traffic control signals shall comply with the requirements of the "Manual on Uniform Traffic Control Devices", current edition, except as noted below.
C. The minimum lens size shall be 12 inches.
Sources
- laserfiche: Resolutions-1997-021 (Resolutions-1997-021.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.