resolution
Resolutions-1997-021
Page 79 of 96
Text read by the vision model; check the PDF for anything that matters.Concrete Pad Detail
Concrete Post
6" NFT Male
or as per Fire Code*
Concrete Pad
See Detail this Sheet
6" Schedule 40 PVC Pipe
2-45° Elbow + 16-20" piece of pipe makes up the wide sweep angle flares
45° Elbow
45° Elbow
Water in riser must remain below frost during high water.
High water level
Low water level
4.5" Below Low Water Level
Screen slightly off the bottom
FIGURE 9.1

Sources
- laserfiche: Resolutions-1997-021 (Resolutions-1997-021.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.