Text read by the vision model; check the PDF for anything that matters.Use this method only if you have a steep bank such that the backhoe cannot reach deep enough to maintain a level trench cut to the riser or if you have a long uphill run. The idea is to maintain a 5' deep trench cut, from the top of the ground, to the riser. Then you must figure out the correct angles when you install the hydrant.
Problems
1. It is hard to figure correct angles for the joints
2. It is hard to dig the trench to match the angle.
3. It takes more time to install
6" NFT Male
or as per Fire Chief
Concrete Pad
See Detail this Sheet
6" Schedule 40 PVC Pipe
Angle?
Angle?
Concrete Post
Water in riser must remain below frost during high-water.
High water level
Low water level
4'-5' Below Low Water Level
Screen slightly off the bottom
Top View
Concrete Pad Detail
Dry Hydrant
Concrete Post (Typical)
FIGURE 9.2