resolution
Resolutions-1997-021
Page 25 of 96
Text read by the vision model; check the PDF for anything that matters.4.07 PAVEMENT MATERIAL AND THICKNESS
A. The pavement slab may be constructed of the following materials:
1. Non-reinforced Portland cement concrete conforming the IDOT specifications C-3 mix or M-3 mix as applicable.
2. Full depth asphaltic concrete hot mix conforming to the IDOT specifications for Type "B" base and Type "A" surface course.
B. Minimum alley pavement thickness:
<table>
<tr>
<th></th>
<th>Residential</th>
<th>Commercial</th>
</tr>
<tr>
<td>Portland Cement Concrete</td>
<td>6"</td>
<td>7"</td>
</tr>
<tr>
<td>Asphalt Cement Concrete</td>
<td>7"</td>
<td>8"</td>
</tr>
</table>
4.08 SUBGRADE REQUIREMENTS
A. The subgrade shall be scarified to a depth of 6-inches below the pavement, and compacted to 90% of Modified Proctor Density.
B. All fill sections shall be compacted to 90% of Modified Proctor Density.
Sources
- laserfiche: Resolutions-1997-021 (Resolutions-1997-021.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.