contract agreement · K-2
Discussion and Consideration to Approve a Professional Service Agreement with the Iowa DOT for the Highway 6 Improvements Project – Motion to Approve — K-2
Page 3 of 13
Text from the PDF text layer; check the PDF for anything that matters.November 2025
IOWA DEPARTMENT OF TRANSPORTATION
Preconstruction Agreement
For Primary Road Project
County Johnson
City Tiffin
Project Nos. STP-006-7(098)--2C-52
PCC Pavement - Grade &
Replace
STPN-006-7(101)--2J-52
PCC Sidewalk/Trail
BRF-006-7(102)--38-52
RCB Culvert Replacement -
Twin Box
Iowa DOT
Agreement No. 2026-4-131
Staff Action No.
This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter
designated "DOT”, and the city of Tiffin, Iowa, a Local Public Agency, hereinafter designated "LPA”, in
accordance with Iowa Code Chapters 28E.12, 306, 306A and 313.4 as applicable;
The DOT proposes to establish or make improvements to U.S. 6 within Johnson County, Iowa; and
The DOT and the LPA are willing to jointly participate in said project, in the manner hereafter provided;
and
The DOT and the LPA previously entered into the following agreement for the above referenced projects:
Agreement No. 2025-P-001 for Predesign was executed by the LPA and DOT on March 7, 2025 and
March 17, 2025 respectively; and
This Agreement reflects the current concept of this project which is subject to modification by mutual
agreement between the LPA and the DOT; and
Therefore, it is agreed as follows:
1. Project Information
a. The LPA shall design; and the DOT shall acquire right of way, let, inspect construction, and perform
contract administration for the following described projects in accordance with the project plans and
DOT Standard Specifications:
STP-006-7(098)--2C-52: Portland cement concrete (PCC) pavement, grade and replace, on U.S.
6 in Tiffin from Grant Street to Park Road.
STPN-006-7(101)--2J-52: PCC sidewalk/trail along U.S. 6 in Tiffin from Roberts Ferry Road to
Park Road. and U.S. 6 and Croell Ave
BRF-006-7(102)--38-52: Reinforced concrete box (RCB) culvert replacement, twin box, on U.S. 6
in Tiffin located 0.2 miles east of Kimberlite Street.
See Exhibit A for project location.
b. As part of the project, the LPA has requested construction of new storm sewers, water main and
associated appurtenances, sidewalk, traffic signals at the intersection of U.S. 6 and Kimberlite Street,
widening of the U.S. 6 pavement, and the extension of one existing box culvert within the city of Tiffin
2026-4-131_Tiffin 1
Sources
- revize: K-2 (Mm9BMoO5BW2h22YZFjfwxwGHtYxkLP.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-2 Discussion and Consideration to Approve a Professional Service Agreement with the Iowa...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.