contract agreement · E-3

Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3

Dated September 1, 2026City Council — regular meeting, September 1, 2026 72 pages

Open the PDF Searchable (OCR) PDF

Page 31 of 72

Text from the PDF text layer; check the PDF for anything that matters.
PLAN REVIEW RECORD Building Address: 119 Brown St Project: Water Treatment Facility Upgrade and Addition Permit #: 4748 Reviewed By: Nick Sitzman Date(s): 7/22/2025 Construction Type: V-B? Occupancy Type: B, S-1? H-3/4? F-1? NEEDS NO REVIEW DEFFERED DISCIPLINE APPROVED CLARIFICATION REQ’D SUBMITTAL _______________________________________________________________________________________ NON-STRUCTURAL X STRUCTURAL X MECHANICAL X ELECTRICAL X PLUMBING X FLOOD PLAIN X STREET/SIDEWALK X ZONING X FIRE PROTECTION X CODES: 2018 IRC w/ appx F & J, 2018 IBC w/ appx K, 2024 IFC, Iowa State Electrical Code (2023 NEC), Iowa State Plumbing Code (including Fuel Gas Code) (2024 UPC), and Iowa State Mechanical Code (2024 IMC), 2012 IECC, 2010 ADA. Comments: Please note that this is an on-going review. Additional comments may be generated upon review of responses and/or shop drawings. <7/22/2025 NS> 1 of 4

Sources

Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.