contract agreement · E-3

Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3

Dated September 1, 2026City Council — regular meeting, September 1, 2026 72 pages

Open the PDF Searchable (OCR) PDF

Page 25 of 72

Text read by the vision model; check the PDF for anything that matters.
KEY NOTES 1. NEW HOT AND COLD WATER PIPING UP THROUGH FLOORS, ROUTE UP INSIDE WALLS AND HIGH AS POSSIBLE, SUPPORT FROM WALL. 2. PIPING SHOWN IN APPROXIMATE LOCATION, OFFSET PIPING AS NECESSARY TO NEW FIXTURES, SUPPORT PIPING FROM WALL WHERE POSSIBLE. 3. ROUTE 3/4" DOWN TO CONNECTION ON HOSE BIBB. PROVIDE LINE SIZED SHUTOFF VALVE IN VERTICAL. 4. ROUTE PIPING UP WALL TO CEILING, SUPPORT VERTICAL PIPING FROM WALL. 5. ROUTE NATURAL GAS BRANCH PIPE DOWN WALL TO HVAC EQUIPMENT, SUPPORT FROM WALL WHERE POSSIBLE, PROVIDE SHUTOFF, DIRT LEG, AND REGULATOR. REGULATE DOWN TO MFR REC OPERATING PRESSURE. 6. HUB DRAIN FINAL LOCATION FOR PROCESS DISCHARGE PIPING. FIELD COORDINATE FINAL HUB DRAIN LOCATION WITH PROCESS EQUIPMENT. 7. PROVIDE FIRESTOPPING FOR ALL PIPE PENETRATIONS THROUGH FIRE RESISTANCE RATED WALLS. 20-PLUMBING PROPOSED FLOOR PLAN WATER TREATMENT FACILITY UPGRADE CITY OF TIPPIN JOHNSON COUNTY, IA RO BUILDING PROPOSED PLUMBING ABOVE GRADE FLOOR PLAN

Sources

Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.