contract agreement · E-3
Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 68 of 72
Text from the PDF text layer; check the PDF for anything that matters. Job Truss Truss Type Qty Ply TIFFIN WATER TREATMENT PLANT / STRUCTURE 20
I82462233
26045-RO CJ1 Diagonal Hip Girder 4 1 Job Reference (optional)
Revoswel Truss & Lumber, LLC, Marion, IA - 52302, Run: 25.40 E Dec 15 2025 Print: 25.4.0 E Dec 15 2025 MiTek Industries, Inc. Thu Jun 04 14:17:11 Page: 1
REPAIR: ID:7BQ0ck6_JHZdvKPoRVBB40ygiRV-yin4VumAvs9LqLR4YwAHmsHC2017cNiIjHmtNvz9eD7
BUILDING CODE CHANGED FROM 2015 TO 2018
-2-9-15 5-6-10 11-1-15
2-9-15 5-6-10 5-7-6
4x6
=
5
12 4
2.83
13
3x4 =
16" X 24"
3
12
3-10-1
11
10
2
1
1-2-8
9 7
14 8 15 6
M18AHS 5x14 4x4 = 4x6 =
=
ATTACH 1/2" PLYWOOD OR OSB GUSSET (15/32" RATED SHEATHING 32/16 EXP 1)
TO EACH FACE OF TRUSS WITH (0.131" X 2.5" MIN.) NAILS PER THE FOLLOWING NAIL
SCHEDULE: 2 X 4'S - 3 ROWS: SPACED @ 4" O.C. NAILS TO BE DRIVEN FROM BOTH
FACES. STAGGER SPACING FROM FRONT TO BACK FACE FOR A NET 2" O.C. SPACING
IN EACH COVERED TRUSS MEMBER. USE 2" MEMBER END DISTANCE.
11-1-15
5-6-10 10-11-7
5-6-10 5-4-14
Scale = 1:32.8
0-2-8
Plate Offsets (X, Y): [9:0-3-8,Edge]
Loading (psf) Spacing 2-0-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof) 20.0 Plate Grip DOL 1.15 TC 0.66 Vert(LL) -0.02 8-9 >999 360 MT20 197/144
Snow (Pf/Pg) 19.3/25.0 Lumber DOL 1.15 BC 0.24 Vert(CT) -0.04 7-8 >999 240 M18AHS 142/136
TCDL 10.0 Rep Stress Incr NO WB 0.50 Horz(CT) 0.01 7 n/a n/a
BCLL 0.0 Code IBC2018/TPI2014 Matrix-R
BCDL 10.0 Weight: 48 lb FT = 20%
LUMBER 4) Unbalanced snow loads have been considered for this
TOP CHORD 2x4 SPF 2100F 1.8E design.
BOT CHORD 2x4 SPF 2100F 1.8E 5) This truss has been designed for greater of min roof live Material:
WEBS 2x4 SPF No.2 load of 12.0 psf or 2.00 times flat roof load of 19.2 psf on - 4 trusses x 2 gussets/ truss = 8 gussets
BRACING overhangs non-concurrent with other live loads. - 1 sheets of 1/2" plywood
6) All plates are MT20 plates unless otherwise indicated.
TOP CHORD Structural wood sheathing directly applied or - Nails 0.131 x 2.5
6-0-0 oc purlins, except end verticals. 7) Refer to girder(s) for truss to truss connections.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc 8) Provide mechanical connection (by others) of truss to
bracing. bearing plate capable of withstanding 296 lb uplift at joint Labor:
9 and 196 lb uplift at joint 7. 2 Carpenters for 1 hrs each to layout, cut
REACTIONS (lb/size) 7=691/ Mechanical, 9=683/1-3-15 9) This truss is designed in accordance with the 2018 2 Carpenters for 2 hrs each to attach new gussets in
Max Horiz 9=232 (LC 8) International Building Code section 2306.1 and existing attic space
Max Uplift 7=-196 (LC 8), 9=-296 (LC 7) referenced standard ANSI/TPI 1.
Max Grav 7=734 (LC 12), 9=720 (LC 19) 10) Hanger(s) or other connection device(s) shall be provided
FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 sufficient to support concentrated load(s) 54 lb up at
(lb) or less except when shown. 2-8-7, 54 lb up at 2-8-7, 65 lb down and 83 lb up at
TOP CHORD 2-9=-663/299, 2-10=-919/229, 5-6-6, 65 lb down and 83 lb up at 5-6-6, and 177 lb down
10-11=-904/234, 11-12=-893/226, and 111 lb up at 8-4-5, and 177 lb down and 111 lb up at
3-12=-875/234, 4-7=-327/126 8-4-5 on top chord, and 4 lb down and 18 lb up at 2-8-7,
BOT CHORD 9-14=-326/165, 8-14=-326/165, 4 lb down and 18 lb up at 2-8-7, 14 lb down and 13 lb up
8-15=-326/918, 7-15=-326/918 at 5-6-6, 14 lb down and 13 lb up at 5-6-6, and 34 lb
WEBS 2-8=-223/953, 3-7=-852/301 down at 8-4-5, and 34 lb down at 8-4-5 on bottom
chord. The design/selection of such connection device(s)
NOTES is the responsibility of others.
1) Unbalanced roof live loads have been considered for this 11) In the LOAD CASE(S) section, loads applied to the face
design. of the truss are noted as front (F) or back (B).
2) Wind: ASCE 7-16; Vult=120mph (3-second gust)
Vasd=95mph; TCDL=6.0psf; BCDL=6.0psf; h=15ft; Cat. LOAD CASE(S) Standard
III; Exp B; Enclosed; C-C Corner (3) -2-9-15 to 1-5-0, 1) Dead + Snow (balanced): Lumber Increase=1.15, Plate
Exterior(2R) 1-5-0 to 11-1-15; cantilever left and right Increase=1.15
exposed ; end vertical left and right exposed; Lumber Uniform Loads (lb/ft)
DOL=1.33 plate grip DOL=1.33 Vert: 1-2=-59, 2-4=-59, 4-5=-59, 6-9=-20
3) TCLL: ASCE 7-16; Pr=20.0 psf (roof LL: Lum DOL=1.15 Concentrated Loads (lb)
Plate DOL=1.15); Pg=25.0 psf; Pf=19.2 psf (Lum DOL = Vert: 8=-19 (F=-9, B=-9), 3=-55 (F=-27, B=-27),
1.15 Plate DOL = 1.15); Is=1.1; Rough Cat B; Partially 11=74 (F=37, B=37), 13=-277 (F=-139, B=-139), June 5,2026
Exp.; Ce=1.0; Cs=1.00; Ct=1.00; Min. flat roof snow load 15=-59 (F=-29, B=-29)
governs.
WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 1/2/2023 BEFORE USE.
Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the 16023 Swingley Ridge Rd.
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, and DSB-22 available from Truss Plate Institute (www.tpinst.org) Chesterfield, MO 63017
and BCSI Building Component Safety Information available from the Structural Building Component Association (www.sbcscomponents.com) 314.434.1200 / MiTek-US.com
Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.