contract agreement · E-3
Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 28 of 72
Text read by the vision model; check the PDF for anything that matters.FD-B Dimensional Data
Vertical Mount
<table>
<tr>
<th colspan="2">Single Section Vertical 'B' Hood</th>
<th colspan="2">Two Section Height Vertical 'B' Hood</th>
</tr>
<tr>
<th>Damper Height</th>
<th>'X' Dim.</th>
<th>Damper Height</th>
<th>'X' Dim.</th>
</tr>
<tr>
<td>4" (102) Thru 20" (508)</td>
<td>2" (51)</td>
<td>55" (1397) Thru 64" (1626)</td>
<td>3" (89)</td>
</tr>
<tr>
<td>21" (533) Thru 34" (864)</td>
<td>3" (76)</td>
<td>65" (1651) Thru 82" (2083)</td>
<td>4" (102)</td>
</tr>
<tr>
<td>35" (889) Thru 41" (1041)</td>
<td>4" (102)</td>
<td>83" (2108) Thru 104" (2642)</td>
<td>5" (127)</td>
</tr>
<tr>
<td>42" (1067) Thru 54" (1372)</td>
<td>5" (127)</td>
<td>105" (2667) Thru 114" (2896)</td>
<td>6" (127)</td>
</tr>
</table>


Horizontal Mount
<table>
<tr>
<th colspan="2">Single Section Horizontal 'B' Hood</th>
</tr>
<tr>
<th>Damper Height</th>
<th>'X' Dim.</th>
</tr>
<tr>
<td>4" (102) Thru 20" (508)</td>
<td>2" (51)</td>
</tr>
<tr>
<td>21" (533) Thru 34" (864)</td>
<td>3" (76)</td>
</tr>
<tr>
<td>35" (889) Thru 43" (1092)</td>
<td>4" (102)</td>
</tr>
</table>

Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.