contract agreement · E-3

Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3

Dated September 1, 2026City Council — regular meeting, September 1, 2026 72 pages

Open the PDF Searchable (OCR) PDF

Page 26 of 72

Text read by the vision model; check the PDF for anything that matters.
KEY NOTES 1. PROCESS EQUIPMENT PIPING, TYPE - SEE PROCESS MECHANICAL. 2. ROUTE DUCT DOWN TO 12 INCHES AFT, TERMINATE WITH ALUMINUM SCREEN, RUN OUT TO THE ALUMINUM SCREEN 24" CLEAR. 3. SEE MECHANICAL AND ELECTRICAL VENT PIPEWORK SHOWN, PROVIDE CONCENTRIC VENT KIT AS CLOSE TO EXTERIOR WALL AS POSSIBLE, RUN PIPEWORK TO EXTERIOR WALL, PROVIDE WEATHER AND VAPOR TIGHT SEAL AT WALL PENETRATION, PROVIDE WEATHER AND VAPOR TIGHT SEAL AT WALL PENETRATION. 4. BOTTOM OF ELECTRIC UNIT HEATER SHALL BE MOUNTED 8'6" AFT, PROVIDE WEATHER AND VAPOR TIGHT SEAL AT WALL PENETRATION. 5. CONNECT GAS TO NEW HVAC EQUIPMENT, PROVIDE DIRT LEG SHUTOFF VALVE AND REGULATOR, REGULATE DOWN TO MANUFACTURER RECOMMENDED OPERATING PRESSURE. 6. ALL EQUIPMENT ACCESSORIES AND WORK IN THE AREA SHALL BE SUPPLIED BY THE OWNER. 7. INSTALL CONTROL DEVICE AT 5'6" AFT. 8. ROUTE DUCT DOWN TO 12 INCHES AFT, TERMINATE IN MCC/ELECTRICAL ROOM WITH SCREEN INTO RO SKID ROOM, ELBOW UP AND CONNECT TO FAN, SEE MECHANICAL AND ELECTRICAL VENT PIPEWORK SHOWN, TERMINATE FAN WITH 14 INCHES OF DUCTWORK AND SCREEN. 20-HVAC PLAN 3/16" = 1'-0" (22" x 34") 3/32" = 1'-0" (11" x 17") WATER TREATMENT FACILITY UPGRADE CITY OF TIPPIN JOHNSON COUNTY, IA RO BUILDING HVAC PLAN

Sources

Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.