44.92 48.27 69.63 12.94 15.36 57.87 20.00 873.10 Deduct OSB from base bid: 963.71 39ea @ $22.26 = $868.14 17.50 Total Deduct for building inspector changes $1,068.06 Total Add for building inspector changes $2,123.30 Total CO: $1,055.24