contract agreement · E-3
Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 19 of 72
Text read by the vision model; check the PDF for anything that matters.ITEM ANALYSIS
<table>
<tr>
<th rowspan="2">Item #</th>
<th rowspan="2">Description</th>
<th rowspan="2">QTY</th>
<th rowspan="2">Units</th>
<th rowspan="2">Unit Rate</th>
<th rowspan="2">Man-hours</th>
<th colspan="2">Labor Expense</th>
<th colspan="2">Permanent Materials</th>
<th colspan="2">Sub Contracts/ OHP</th>
<th rowspan="2">Total Direct Cost</th>
</tr>
<tr>
<th>Wages</th>
<th>Total</th>
<th>Engineered Equipment</th>
<th>Total</th>
<th>U.P.</th>
<th>Total</th>
</tr>
<tr>
<td colspan="13"><b>Base Bid Costs (Deducts)</b></td>
</tr>
<tr>
<td>1-1</td>
<td>Masonry Changes - Removal of 1 course of 8" block at chemical rooms - Sewerase</td>
<td>1.5</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ 2,044.00</td>
<td>$ 2,044.00</td>
<td>$ 2,044.00</td>
</tr>
<tr>
<td>1-2</td>
<td>Lumber Changes, Mezzanines - Beiser Lumber</td>
<td>1</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ 1,068.06</td>
<td>$ 1,068.06</td>
<td></td>
<td></td>
<td></td>
<td>$ 1,068.06</td>
<td></td>
</tr>
<tr>
<td>1-3</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>1-4</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>1-5</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>1-6</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="13"><b>Totals</b></td>
<td>$ 1,068.06</td>
<td>$ 2,044.00</td>
<td>$ 3,112.06</td>
</tr>
<tr>
<td colspan="13"><b>Base Bid Changes per Request (Additions)</b></td>
</tr>
<tr>
<td>2-1</td>
<td>Masonry Changes - Addition of 4" block at chemical rooms - seweras</td>
<td>1</td>
<td>LS</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ 8,445.00</td>
<td>$ 8,445.00</td>
<td>$ 8,445.00</td>
</tr>
<tr>
<td>2-2</td>
<td>Lumber Changes, Mezzanines - Beiser Lumber</td>
<td>1</td>
<td>LS</td>
<td></td>
<td></td>
<td></td>
<td>$ 2,123.30</td>
<td>$ 2,123.30</td>
<td></td>
<td></td>
<td></td>
<td>$ 2,123.30</td>
<td></td>
</tr>
<tr>
<td>2-3</td>
<td>Wood Install Labor - 3 guys 6 hrs - Carpenters - Tricon</td>
<td>1</td>
<td>LS</td>
<td>24.00</td>
<td>78.77</td>
<td></td>
<td>$ 1,890.48</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ 1,890.48</td>
<td></td>
</tr>
<tr>
<td>2-4</td>
<td>Southside Concrete - Concrete Floor - 5-112 (North Side Rm) - Flg extended from 5-107 to 7-97 North - Southside Concrete</td>
<td>1</td>
<td>LS</td>
<td>5.00</td>
<td>60.00</td>
<td></td>
<td>$ 400.00</td>
<td>$ 400.00</td>
<td>$ 180.00</td>
<td>$ 180.00</td>
<td></td>
<td>$ 580.00</td>
<td></td>
</tr>
<tr>
<td>2-5</td>
<td>Door Changes - No cost for 1hr fire rated door changes - Kurtz Hardware</td>
<td>1</td>
<td>LS</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-6</td>
<td>Paint - No cost charges for coatings - DA Bunch</td>
<td>1</td>
<td>LS</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-7</td>
<td>HVAC Changes - Fire Damper addition in Anti-Scant Room 20-102 - Fosters Kraus</td>
<td>1</td>
<td>LS</td>
<td>5.00</td>
<td>120.00</td>
<td></td>
<td>$ 600.00</td>
<td>$ 200.00</td>
<td>$ 200.00</td>
<td>$ 80.00</td>
<td>$ 80.00</td>
<td>$ 880.00</td>
<td></td>
</tr>
<tr>
<td>2-8</td>
<td>Fire rated caulking & mineral wool for present vertical joints - Minn labor and install - Mt. Vernon Construction</td>
<td>1</td>
<td>LS</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-9</td>
<td>Fire rated caulking & mineral wool for present horizontal joints - No cost charges</td>
<td>1</td>
<td>LS</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-10</td>
<td>Fire rated caulking labor for chem room ceiling joints - 1 guy for 8 hrs - Tricon</td>
<td>1</td>
<td>LS</td>
<td>8.00</td>
<td>73.81</td>
<td></td>
<td>$ 590.48</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$ 590.48</td>
<td></td>
</tr>
<tr>
<td>2-11</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-12</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-13</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-14</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-15</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2-16</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td colspan="13"><b>Totals</b></td>
<td>$ 3,480.96</td>
<td>$ 3,123.30</td>
<td>$ 10,641.00</td>
<td>$ 17,345.26</td>
</tr>
</table>
Delta = Orange - Blue (pos # is total add, neg # is total deduct)
NOTES: Delta = (Addition total - Base Bid total)
The above costs do not include any contractual markups.
Project Manager or Authorized Designee Signature
X
Date:
Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.