ordinance · G-1,H-2
G-1, H-2 - Ordinance 2022-492 - Rezoning Prairie Village Part 3 - R-1A, R-2, R-4 to R-1D-OPD, R-2-OPD and R-4-OPD
Dated February 1, 2022City Council — regular meeting, February 1, 2022 64 pages
Ord. 2022-492, Ord. 2021-492
Page 58 of 64
Text read by OCR; check the PDF for anything that matters. T'-4 |/2" STAIR NOTE: 8'-|" STAIR NOTE:
(USE 14" Tl WITH 3/4" PLYWOOD SUBFLOOR) (USE 14" Tl WITH 3/4" PLYWOOD SUBFLOOR)
14 TREADS AT 10" EACH VERIFY 14 TREADS AT 10" EACH VERIFY
TOTAL
I5 RISERS AT +/- 1.35" = II0 1/4" TOTAL I5 RISERS AT +/- 7.45% = Ill 3/4"
RISE VERIFY RISE VERIFY
8'-4 |/2" STAIR NOTE: q'-|" STAIR NOTE:
(USE 14" TJ WITH 3/4" PLYWOOD SUBFLOOR) (USE 14" TJ WITH 3/4" PLYWOOD SUBFLOOR)
15 TREADS AT IO" EACH VERIFY I@ TREADS AT |O" EACH VERIFY
1/4" TOTAL
16 RISERS AT +/- 1.64" = 122 IT RISERS AT +/- 1.28" = 123 3/4" TOTAL 26-0"
RISE VERIFY RISE VERIFY
TOOL 2Y 27-10"
OF TENANT
SEPARATION 3410" . 440"
0 6-0" 1 BL" ; 4-0" L
(23050 $H | | \4x6! DECK AT
a 4
+ TiS CONC OPTIONAL
: . PATIO
BASEMENT
9
casua' ining
BUI"
C
[a] Hf =
Q .
oH S
- SSIIK a NO: |DATE: | REVISION:
a S| *
is) AN 0413.21
aor | ate 36", 26"
3050l6h sono 3050|eH .
—— yi
8-4" ae -.!
- FOR ADDITIONAL NOTES SEE GENERAL NOTES ON TITLE SHEET AND DETAILS.
— tf li S!
- WINDOW HEAD HEIGHTS: —— ———* 36 living is
IST FLOOR = T'-O* U.N.O. ON ELEVATIONS.
z9 t—1—ISLANG _|"
2ND FLOOR = T'-O" UN.O. ON ELEVATIONS.
a | 4|——434 1/2} | o rip
St
sso] eT NEE WALI
ALL DIMENSIONS TO WINDOWS AND DOORS ARE TO CENTERLINE.
|
Ry _ loys By |
6 OP
O!
il
11
yz —
BH] 81
al || >;
PROFESSIONAL SEAL:
WALL LEGEND:
2D SS7 | 2h |
\ = |
|
FULL HEIGHT FULL HEIGHT.
i
ASI —*
fttit —*
2x4 WOOD STUD PARTITION 2x6 WOOD STUD PARTITION NY FLOOR
>_> ZZ sD aatt 2 ody wz a | 12-64 ABOVE .
BRICK / STONE VENEER
STUD WALL BELOW
HEIGHT AND STUD SIZE AS NOTED
yi
==
kitcherl_/~
1 x
vl +40"“taro
SLOPING:
—— EZw4 ale 8'-I" cl aS =
LON GYPSUM BOARD WALL DRYWALL OFENNG, HEIGHT Patsy 4 9g PR \ ADD (2)
[el yg N f ae ADDITIONAL __ I.
HEIGHT AND STUD SIZE AS NOTED AS NOTED
‘| Lu 2D calf A RISERS AT 4" a] 2 PROJECT TITLE:
°: | a q PLATE HeloHT «>|
N . 45H a Ae —J veyic)
Duplex
: 2-0" | oq = 8
=
EN ~~
FIRE PROTECTION:
[1] HOUSE TO GARAGE FIRE SEPARATION. GARAGE/HOUSE SEPARATION
=
AT VERTICAL SURFACES SHALL BE PROTECTED vom pa Series
WITH ONE (I) LAYER |/2" GYPSUM BOARD. (PER LOCAL CODES)
CLine OF BASEMENT 1| Master Set
SHALL BE PROTECTED WITH ONE (I) LAY
GARAGI E/HOUSE SEPARATION AT HORIZONTIAL SURFACES
YER 5/8" BELON | STEPS MAY OCCUR,
TYPE 'X' GYPSUM BOARD. (PER LOCAL CODES) SEE CIVIL DRAWINGS. (lowa)
2] HOUSE TO GARAGE DOOR SEPARION PROVIDE |-3/8" SOLID
q PROVIDE HANDRAIL
AND GUARDRAIL PER
RATED DOOR. (PER LOCAL copes)”
CORE DOOR OR APPROVED
2:
LOCAL CODE.
- 6-0"
BENEATH STAIRS AND LANDINGS. |/2" GYPSUM BOARD
ON WALLS AND CEILING OF ENCLOSED ACCESSIBLE
HB
z
Eno 6-1"
AREAS. (PER LOCAL CODES)
MEPS
2)
foye
=
$se APsdr 4 myer (3)
WATER HEATER, PER LOCAL CODES
NA >
& a
=
a2
[6] A/c CONDENSER PAD. (VERIFY)
[7] PRE-FABRICATED METAL FIREPLA CE.
(eo)
INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
2] ATTIC ACCESS- REMOVABLE 22"X30" PANEL.
25
MINIMUM 30" CLEAR HEADROOM ABOVE ACCESS OPENING.
CLIENTS NAME:
2] 9
=
TYPICALS:
[4] TEMPERED SAFETY GLASS. (PER LOCAL CODES) FIT
16010 SECTIONAL i] see exteiey |
PLYWOOD SHELF ABOVE WITH DRYWALL FINISH OVER. HEIGHT AS NOTED.
Ss SSS ES
[it] HALF WALL, HEIGHT AS NOTED.
INTERIOR SOFFITS: FFL = 1-6" UNO. SFL = T-6" UNO.
MASONRY ———}[7
VENEER AT ELEV
> "
caelBOX
BATHS:
"A-2" AND 'B-2" 2-3" 6-0" 23" 6-8" PN CENTER BEAM ON
COLUMN POST
20-6" qa"
SHONER.
TUB-SHONER COMBO. 27-10"
NA TO CL. 280
OF TENANT
ACRYLIC TUB W CERAMIC PLATFORM SEPARATION 1st FLOOR
PLAN '4EGF'
Ist Floor Plan 'A’/'B' at Oot Basement
KITCHEN:
OPTIONAL 30" SLIDE-IN RANGE, PACKAGE PER BUILDER
VENT PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
SCALE: |/4"=|'-O" AT 22"X34" LAYOUT 1/8"=!'-O" AT II"XI7" LAYOUT
([] 30° GAS COOKTOP AND HOOD.
VENT PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
{ia] ELECTRIC OVEN WITH MICROWAVE OVEN. PRINT DATE:
September 25, 2020
‘SHEET NO:
A2.1
Sources
- sharepoint (G-1, H-2 - Ordinance 2022-492 - Rezoning Prairie Village Part 3 - R-1A, R-2, R-4 to R-1D-OPD, R-2-OPD and R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.