Drainage at Fire Station
Page 2 of 8
Text read by the vision model; check the PDF for anything that matters.Alleyway Option 2: Partial Alleyway and Full Driveway Replacement
100% Reduction
EST. $196,000
Pavement reconstruction with valley for surface runoff towards 2nd St
PRE CONSTRUCTION
3,760 SF total drainage existing to garage door low point
POST CONSTRUCTION
No water draining to garage door low point after construction
Connect downspouts to underground pipe and connect to storm sewer system
Legend:
Pre-Construction Flow Area
Post Construction Flow Area
Pavement Reconstruction
Existing Flow Direction
Existing Gutter Outflow Location
Proposed Storm Improvements