Parking Lot Option 3: Remove and Replace Pavement 100% Reduction EST. $79,000 PRE CONSTRUCTION 20,346 SF total drainage existing to low point between doors Replace stoops and replace pavement with valley for surface runoff towards Main Street POST CONSTRUCTION No water ponding at entrances to fire station Pre-Construction Flow Area Post Construction Flow Area Pavement Reconstruction Existing Flow Direction Existing Gutter Outflow Location Proposed Storm Improvements