Text read by the vision model; check the PDF for anything that matters.Parking Lot Option 1: Introduce Curb and Gutter
25% Reduction
EST. $20,000
PRE CONSTRUCTION
20,346 SF total drainage existing to low point between doors
Replace stoops, pave curb and gutter between doors, and remove and replace surround pavement for surface runoff towards Main Street
POST CONSTRUCTION
Reduced ponding at entrances to fire station, there may be some ponding depending on storm level.
Pre-Construction Flow Area
Post Construction Flow Area
Pavement Reconstruction
Existing Flow Direction
Existing Gutter Outflow Location
Proposed Storm Improvements