Drainage at Fire Station
Page 6 of 8
Text read by the vision model; check the PDF for anything that matters.Parking Lot Option 2: Storm Sewer Improvements
50% Reduction
EST. $39,000
PRE CONSTRUCTION
20,346 SF total drainage existing to low point between doors
Install intake between doors and storm system to connect to existing line
POST CONSTRUCTION
Water will flow into area intake and into storm sewer, there may be some ponding depending on storm level
Legend:
Pre-Construction Conditions
Post Construction Conditions
Pavement Reconstruction
Existing Flow Direction
Existing Gutter Outflow Location
Proposed Storm Improvements