Drainage at Fire Station

Open the PDF Searchable (OCR) PDF

Page 1 of 8

Text read by the vision model; check the PDF for anything that matters.
Alleyway Option 1: Partial Alleyway Replacement 52% Reduction EST. $128,000 Pavement reconstruction with valley for surface runoff towards 2nd St PRE CONSTRUCTION 3,760 SF total drainage existing to garage door low point POST CONSTRUCTION 1,805 SF remains draining to garage door low point after construction Legend: Pre-Construction Flow Area Post Construction Flow Area Pavement Reconstruction Existing Flow Direction Existing Gutter Outflow Location Proposed Storm Improvements