ordinance · H-2
Ordinance No. 2025-523 – An Ordinance Rezoning Grove Park Area, Tiffin, Iowa
Page 17 of 25
Text from the PDF text layer; check the PDF for anything that matters. COPYRIGHT PROTECTION UNDER FEDERAL LAW (TITLE 17, U.S. CODE)
Above law limits the use of this document (drawing/data) to this specific project only, and duplication whole or in part for use on other than this project is prohibited.
LEGAL DESCRIPTION PROPERTY INFORMATION
FUTURE PUBLIC WALK E MARENGO R Δ=000°10'42"
A.03 FUTURE CURB LINE OAD / HWY 6 LOT 30, TIFFIN EAST, TIFFIN, IOWA ACCORDING TO THE PLAT THEREOF CURRENT ZONING
R=71260.01' RECORDED IN BOOK 34 PAGE 6, PLAT RECORDS OF JOHNSON COUNTY. NEIGHBORHOOD COMMERCIAL DISTRICT - C1-B
FUTURE PUBLIC WALK L=221.63'
A.03 FUTURE CURB LINE CH=221.63' PROPOSED ZONING
CB=N85°49'52"W PLANNED OVERLAY DISTRICT - OPD
UNDERLYING ZONE - R-5
N86°14'37"W 2 A.04 PROPERTY AREA 255,097 SF 5.86 AC
97'
49'
78.48' APPLICANT INFORMATION
28' 28' A.04
30' OPD PROPERTY INFORMATION
41' 26'
PROPERTY OWNER
28' MINIMUM DIMENSIONS
28' 443 MARENGO LC
44' A.04 LOT AREA 2,200 SF
52'
63'
96'
5 DEVELOPER
LOT WIDTH
LOT DEPTH
27 FEET
80 FEET
4
85'
PACE CONSTRUCTION, LLC
96' 3 2 1 1321 SUNSET STREET, SUITE 1
DRIVEWAY LENGTH (TO BACK OF CURB) 20 FEET
84'
81'
84'
52
27'
SIDEYARD 10 FEET
84'
6 51
46'
50 49 48 IOWA CITY, IA 52246
27'
83'
BUILDING SETBACK - PRINCIPAL USE 10 FEET
82'
82'
BUILDING SETBACK - ACCESSORY USE 5 FEET
27'
46'
W
96' 27' 27' CIVIL ENGINEER
30' REAR SETBACK 15 FEET
27'
7 131' SHOEMAKER AND HAALAND
27'
47
27'
AUTUMN SPLEND 96'
MICHAEL J. WELCH, PE
ALL PROPOSED STREETS ARE PRIVATE AND LOCATED IN A COMMON SHARED LOT.
OR DRIVE
S02°45'36"E 284.74'
27'
160 HOLIDAY ROAD
58'
96' THE ALLEYS ARE LOCATED IN A SHARED ACCESS EASEMENT.
A.05
36'
CORALVILLE, IA 52241
27'
8 46
27'
27'
319-351-7150
96' REFER TO CIVIL PLANS FOR ADDITIONAL INFORMATION, INCLUDING EXISTING AND
27'
96' PROPOSED TOPOGRAPHY.
33'
29'
9 45
27'
NOTES
33'
10' A.01. .A.01 28 53 96'
128'
33'
120'
STEPHANS STREET
96' 1. ALL STREETS ARE PRIVATE AND OWNED AND MAINTAINED BY THE
25'
33'
44
33'
HOME OWNERS ASSOCIATION (HOA).
54 KEYNOTES:
25'
10 27
33'
2. ALL STORM SEWER STRUCTURES AND PIPING AREA PRIVATE.
127' 120' 96' 3. ALL SANITARY SEWER AND WATER MAIN IS PUBLIC AND LOCATED
27'
25'
33'
96' WITHIN UTILITY EASEMENTS. A.01 14.5' ACCESS EASEMENT
26 55
10'
25'
4. ACCESS EASEMENT PROVIDED OVER ALL PRIVATE STREETS FOR CITY
33'
N00°58'17"W 493.61'
11 43 A.02 EMERGENCY ACCESS VIA EASEMENT (BOOK 6150, PAGE 683)
27'
126' 120' MAINTENANCE ACCESS.
GROVE PARK WAY
96' 5. TEMPORARY TURNAROUNDS TO BE PROVIDED AS REQUIRED DURING A.03 RIGHT-TURN LANE AND PUBLIC SIDEWALK TO BE CONSTRUCTED AS
COFFEE TREE WAY
27'
33'
33'
96' 56
27'
25 EACH PHASE TO MEET FIRE MARSHALL'S REQUIREMENTS. PART OF HWY 6 IMPROVEMENTS.
15'
12 42
HARVEST GOLD WAY
27'
A.01. A.01 6. STORM WATER BASIN TO BE COMPLETED IN PHASE 1.
27'
A.04 DEVELOPER TO CONSTRUCT SIDEWALK AND DRIVEWAY CROSSING,
494'
125' 120' 96' 7. REFER TO PAGE 2 FOR TYPICAL STREET SECTION. INCLUDING CURB RAMPS, WITH THIS DEVELOPMENT
96' 8. REFER TO PAGE 2 FOR EXISTING AND PROPOSED CONTOURS.
33'
27'
27'
33'
A.05 PAVED TURN AROUND MEETING INTERNATIONAL FIRE CODE (IFC) TO BE
9' 19'
13 41 9. REFER TO PAGE 3 FOR ACCESS AND UTILITY EASEMENT CONSTRUCTED AS PART OF PHASE I IMPROVEMENTS.
27'
32
S02°45'36"E 189.98'
24 96'
INFORMATION.
96' 124' 120'
27'
25'
14 40
33'
27'
31
25'
23
33'
10'
123' 120' 96' UNIT AND PARKING INFORMATION
25'
96'
33'
22 30 39
25'
PHASE 1 PHASE 2 PHASE 3 PHASE 4
33'
33'
33'
15 122' 120'
96' PROJECT TOTALS
30'
21 29
30'
96' UNIT PARKING UNIT PARKING UNIT PARKING UNIT PARKING UNIT PARKING
33'
27'
33'
UNIT QTY GAR DRV QTY GAR DRV QTY GAR DRV QTY GAR DRV QTY BEDS GAR DRV LOT NOs.
16 38
27'
121' 120' TYPE "A" (4-BED) 0 0 0 8 16 0 4 8 0 4 8 0 16 64 32 0 21 - 32, 53 - 56
96' TYPE "B" (3-BED) 4 8 8 0 0 0 0 0 0 4 8 8 8 24 16 16 1 - 4, 49 - 52
96'
27'
TYPE "C" (3-BED) 5 10 10 11 22 22 11 22 22 5 10 10 32 96 64 64 5 - 20, 33 - 48
27'
17 POND VIEW DRIVE 37
27'
27'
GUEST PARKING -- 0 3 -- 0 11 -- 0 3 -- 0 3 -- -- 0 20 --
96' TOTAL 9 18 21 19 38 33 15 30 25 13 26 21 56 184 112 100
96'
27'
27'
18 36
27'
27'
GAR = GARAGE
122'
96' DRV = DRIVEWAY / STREET
96'
27'
27'
91.9'
19 35 PROJECT TOTAL
27'
COMMON AREA
27'
106.8'
96' 56 UNITS
83,532 SF
151'
PROPOSED 184 BEDS
212 PARKING SPACES
20
27'
34
33'
27'
STORM WATER BASIN
PARKING REQUIRED
N19°28'23"W 88' 96' 1 SPACE PER BEDROOM (MIN. 2 PER UNIT) 1 x 184 = 184 SPACES
46.09' 33
33'
33'
1 SPACE PER FOUR UNITS 1/4 x 56 = 14 SPACES
TOTAL 198 SPACES
96'
T
STREE N52°56'29"W A.02
E 2ND 46.09'
S86°47'54"W 371.06'
CITY APPROVAL:
Z:\2024\24317\DRAWINGS\BASE\24317 C-LINE.DWG, 1 OF 3, 10/31/2025 6:34:55 PM
N87°00'42"W APPROVED BY THE CITY OF TIFFIN, IOWA.
61.89'
CITY CLERK DATE
H ADDRESS CITY COMMENTS 10-31-25 CLIENT PROJECT SHEET TITLE PROJECT NUMBER: SHEET NUMBER
G ADDRESS CITY COMMENTS 10-13-25
Shoemaker PACE CONSTRUCTION, LLC GROVE PARK ROWHOMES PRELIMINARY PLAT 24317
0 20 40 60 80
F
E
REVISED SITE PLAN
REVISED PHASING & UTILITY LAYOUT
09-29-25
09-29-25
Haaland
1321 SUNSET STREET, SUITE 1
IOWA CITY, IA 52246
ISSUED DATE:
DRAWN BY:
10-31-2025
KJB
1 of 3
FEET
D.1 REVISED PARKING CALCULATIONS 08-14-25 CHECK BY: MJW H
NO. REVISION DATE APPROVED BY: MJW REV
Sources
- revize: Attachment (pY9MdZV1sSOZE1hUDUsDHgmJUg257W.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (H-2 - Ordinance 2025-523 - Grove Park Rowhome OPD and Rezoning - R-12, C-1B to R-4 OPD 2-.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: H-2 Ordinance No. 2025-523 – An Ordinance Rezoning Grove Park Area, Tiffin, Iowa
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.