ordinance · H-2
Ordinance No. 2025-523 – An Ordinance Rezoning Grove Park Area, Tiffin, Iowa
Page 13 of 25
Text from the PDF text layer; check the PDF for anything that matters. COPYRIGHT PROTECTION UNDER FEDERAL LAW (TITLE 17, U.S. CODE)
Above law limits the use of this document (drawing/data) to this specific project only, and duplication whole or in part for use on other than this project is prohibited.
0 20 40 60 80
FUTURE SIDEWALK (TYP.) Δ=000°10'42" FEET
FUTURE ROADWAY E MARENGO R R=71260.01'
PAVEMENT EXTENTS (TYP.) OAD / HWY 6 L=221.63'
CH=221.63'
CB=N85°49'52"W KEYNOTES:
A.01 PCC ROADWAY PAVEMENT (7")
N86°14'37"W 278.48 A.02 PCC PARKING LANE PAVEMENT (5")
97'
49' '
28' 28' 30' 41' A.03 PCC SIDEWALK
26' 28' 28' 44'
96'
52'
A.04 RETAINING WALL. REFER TO SHEET C420.
63'
5 A.06
STEPHANS STREET
A.06
4 A.05 RETAINING WALL. REFER TO SHEET C421.
85'
3 2
81'
1
46'
96' A.01
52
84'
48
84'
51
84'
A.06
50 49
27'
83'
6
82'
A.06 "NO PARKING - FIRE LANE" SIGN
82'
27'
27'
A.06
A.07
46'
W
27'
27'
96' 27' 30' 47 A.07 STREET LIGHT
27'
131'
7 A.07
96' A.08 PAVED TURN AROUND MEETING INTERNATIONAL FIRE CODE (IFC) TO BE
S02°45'36"E 284.74' 27'
27'
CONSTRUCTED AS PART OF PHASE I IMPROVEMENTS.
AUTUMN SPLENDO
36'
58'
96' R DRIVE A.08
46
27'
27'
8 96'
27'
A.02
27'
A.07 A.03 A.02
29'
96'
45
27'
33'
A.04 9 53 96'
33'
28
33'
120'
25'
128'
44
33'
96'
33'
PHASE UNITS
27 A.02 54
25'
96'
10 120'
33'
127' PHASE 1 STORM WATER BASIN & 1 - 9
25'
33'
27'
GROVE PARK WAY
55
33'
"W 493.61'
96' A.01
26 43
25'
PHASE 2 10 - 28
120'
11 126' 96'
27'
33'
PHASE 3 29 - 43
27'
96'
27'
33' 25 56
27'
A.02 A.01 42 PHASE 4 43 - 56
12
494'
96'
27'
120'
N00°58'17
125' A.04
27'
33'
33'
96' A.01
27'
41
27'
S02°45'36"E 189.98'19'
13 24 32 96'
120'
9'
124'
27'
25'
96'
27'
A.02
31 40
14
33'
23
25'
96'
33'
123' 120'
25'
33'
39
33'
96'
22 30
25'
120'
33'
122' 96'
33'
15 A.02
30'
29
HARVEST GOLD WAY
21
33'
30'
33'
96'
38
27'
A.07 120'
16 121'
27'
96'
27'
96'
27'
37
27'
A.02 POND VIEW DRIVE A.02
17
27'
96'
A.01
27'
96' A.06
27'
A.06 36
27'
A.07
18 A.07
27'
96'
2'
COFFEETREE WAY 12
96'
27'
27'
35
27'
19 COMMON AREA A.06
96'
27'
151'
83,532 SFMANAGEMENT
STORMWATER
27'
27'
A.06
BASIN 34
20
33'
96' A.04
N19°28'23"W 33
33'
33'
88'
46.09'
96'
NOTES:
E T N52°56'29"W S86°47'54"W 371.06'
S T RE 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL
NECESSARY PERMITS FOR CONSTRUCTION, INDLUCING BUT NOT
E 2ND
46.09' LIMITED TO, WORK IN THE RIGHT-OF-WAY PERMIT FROM IOWA DOT.
Z:\2024\24317\DRAWINGS\24317 C200.DWG, C200, 10/31/2025 8:51:26 PM
2. THE DEVELOPER AND CONTRACTOR ACKNOWLEDGE THAT HIGHWAY
EMERGENCY ACCESS 6 WILL BE RECONSTRUCTED AT SOME FUTURE TIME. THIS
PROVIDED VIA EXISTING RECONSTRUCTION MAY REQUIRE MODIFICATIONS TO THE ENTRANCE
N87°00'42"W EASEMENT RECORDED IN DRIVE PAVEMENT. ADDITIONAL APPROVALS MAY BE REQUIRED BY
61.89' BOOK 6150 PAGE 683 OF THE CITY OF TIFFIN FOR DESIGN CHANGES NEEDED TO
JOHNSON COUNTY ACCOMMODATE THIS FUTURE CONSTRUCTION.
RECORDERS OFFICE.
H ADDRESS CITY COMMENTS 10-31-25 CLIENT PROJECT SHEET TITLE PROJECT NUMBER: SHEET NUMBER
G ADDRESS CITY COMMENTS 10-13-25
Shoemaker PACE CONSTRUCTION, LLC GROVE PARK ROWHOMES SITE LAYOUT PLAN 24317
F
E
REVISED SITE PLAN
REVISED PHASING & UTILITY LAYOUT
09-29-25
09-29-25
Haaland
1321 SUNSET STREET, SUITE 1
IOWA CITY, IA 52246
ISSUED DATE:
DRAWN BY:
10-31-2025
KJB
C200
D.1 REVISED PARKING CALCULATIONS 08-14-25 CHECK BY: MJW H
NO. REVISION DATE APPROVED BY: MJW REV
Sources
- revize: Attachment (pY9MdZV1sSOZE1hUDUsDHgmJUg257W.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (H-2 - Ordinance 2025-523 - Grove Park Rowhome OPD and Rezoning - R-12, C-1B to R-4 OPD 2-.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: H-2 Ordinance No. 2025-523 – An Ordinance Rezoning Grove Park Area, Tiffin, Iowa
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.