plat site plan · E

Discussion and Consideration of OPD Site District, Park Place City Center – Part One, Phase Seven, Lots 9-14 – Marvin Gardens — Marvin Gardens Site Plan

Open the PDF

Page 3 of 17

Text from the PDF text layer; check the PDF for anything that matters.
THE CONTRACTOR SHALL PROVIDE TRAFFIC PAVING LEGEND 8.91 AC. CONTROL PER IDOT STANDARD ROAD PLAN TC-402 AND CITY OF TIFFIN REQUIREMENTS AT ALL TIMES MATERIAL USE DURING WORK WITHIN PUBLIC R.O.W. THE CONTRACTOR SHALL COORDINATE WITH UTILITY PROVIDERS FOR ANY REQUIRED RELOCATION OF EXISTING UTILITIES. CIVIL ENGINEERS LAND PLANNERS 15 LAND SURVEYORS 0 2 5 10 15 20 15 4 GRAPHIC SCALE IN FEET LANDSCAPE ARCHITECTS 12 1"=20' ENVIRONMENTAL SPECIALISTS 1917 S. GILBERT ST. IOWA CITY, IOWA 52240 (319) 351-8282 18 18 www.mmsconsultants.net 18 7 7 4 15 18 8 15 15 C120 OVERALL LAYOUT PLAN 18 C121 OVERALL PARKING PLAN 15 C122-C124 DETAILED SITE DIMENSION LAYOUT C140 OVERALL GRADING, EROSION 10/09/2026 PER CITY COMMENTS - RAN/HEH 7 4 CONTROL, AND SWPPP C141-C145 DETAILED GRADING PLAN 15 C160 UTILITY PLAN - SANITARY SEWER C161 UTILITY PLAN - WATER MAIN 7 C162 UTILITY PLAN - STORM SEWER 7 C500 GENERAL NOTES AND DETAILS 5 7 C501 GENERAL NOTES AND DETAILS 4 L100 LANDSCAPE PLAN 16 7 18 18 4 18 18 8 8 KEYNOTES 15 NUMBER KEYNOTE DETAIL 4 1 15 14 18 7 2 11 3 8 4 18 5 4 14 18 15 6 DETAILED SITE 7 DIMENSION 12 4 7 8 LAYOUT PLAN 7 9 12 9 10 14 15 11 14 16 AUDITOR'S PARCEL 9 8 12 2024071 13 18 11 14 AUDITOR'S PARCEL 2024075 15 16 PARK PLACE CITY CENTER - 17 PART ONE, 18 PHASE SEVEN, LOTS 9-14 TIFFIN JOHNSON COUNTY, IOWA 9 G:\6385\6385-065\const\6385065Y.dwg, 10/9/2026 2:35:22 PM, 1:1 IOWA MMS CONSULTANTS, INC. 08/24/2026 16 ONE CALL SM RAN TAV/RAN 1"=20' RAN C122 6385-065

Sources

  • revize: Marvin Gardens Site Plan (YQW9ke7S2lxGGdpHewFSNs40LeJGv8.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: E Discussion and Consideration of OPD Site District, Park Place City Center – Part One,...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.