plat site plan · E
Discussion and Consideration of OPD Site District, Park Place City Center – Part One, Phase Seven, Lots 9-14 – Marvin Gardens — Marvin Gardens Site Plan
Page 2 of 17
Text from the PDF text layer; check the PDF for anything that matters. 8.91 AC.
R G R EEN RO AD
FO R E V E
0 5 25 50
GRAPHIC SCALE IN FEET
1"=50'
CIVIL ENGINEERS
LAND PLANNERS
LAND SURVEYORS
LANDSCAPE ARCHITECTS
ENVIRONMENTAL SPECIALISTS
BOARDWALK AVENUE
1917 S. GILBERT ST.
IOWA CITY, IOWA 52240
(319) 351-8282
www.mmsconsultants.net
C120 OVERALL LAYOUT PLAN
C121 OVERALL PARKING PLAN
C122-C124 DETAILED SITE DIMENSION LAYOUT
C140 OVERALL GRADING, EROSION 10/09/2026 PER CITY COMMENTS - RAN/HEH
CONTROL, AND SWPPP
C141-C145 DETAILED GRADING PLAN
C160 UTILITY PLAN - SANITARY SEWER
C161 UTILITY PLAN - WATER MAIN
C162 UTILITY PLAN - STORM SEWER
C500 GENERAL NOTES AND DETAILS
C501 GENERAL NOTES AND DETAILS
L100 LANDSCAPE PLAN
LOTS 9-14 PARKING REQUIREMENTS
LOT 6 PARKING REQUIREMENTS
OVERALL PARKING
PLAN
PARK PLACE
CITY CENTER -
PART ONE,
PHASE SEVEN,
LOTS 9-14
THE CONTRACTOR SHALL PROVIDE TRAFFIC TIFFIN
CONTROL PER IDOT STANDARD ROAD PLAN TC-402 JOHNSON COUNTY,
AND CITY OF TIFFIN REQUIREMENTS AT ALL TIMES IOWA
DURING WORK WITHIN PUBLIC R.O.W.
THE CONTRACTOR SHALL COORDINATE WITH
UTILITY PROVIDERS FOR ANY REQUIRED
G:\6385\6385-065\const\6385065Y.dwg, 10/9/2026 2:35:14 PM, 1:1
RELOCATION OF EXISTING UTILITIES.
IOWA MMS CONSULTANTS, INC.
08/24/2026
ONE CALL SM
RAN
TAV/RAN 1"=50'
RAN
C121
6385-065
Sources
- revize: Marvin Gardens Site Plan (YQW9ke7S2lxGGdpHewFSNs40LeJGv8.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E Discussion and Consideration of OPD Site District, Park Place City Center – Part One,...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.