contract agreement · K-4
Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 59 of 63
Text from the PDF text layer; check the PDF for anything that matters. Clint Wienen, PE | Senior Project Engineer
MSA Professional Services, Inc.
100% Employee Owned
+1 (563) 584-2897
From: Tom Shedek <[email protected]>
Sent: Wednesday, February 25, 2026 10:41 AM
To: Clint Wienen <[email protected]>
Subject: FW: Tiffin WTP Low Lift Pumps - 0915659
Clint,
Let me know your thoughts on this as a credit that Gary is proposing.
Tom
Tom Shedek, PMP | Project Manager
TRICON CONSTRUCTION GROUP
C: 913.238.6689
[email protected]
From: Gary Ganoe <[email protected]>
Sent: Wednesday, February 25, 2026 10:06 AM
To: Tom Shedek <[email protected]>
Cc: Andy Knapp <[email protected]>; Andrew Larson <[email protected]>; [email protected]
Subject: RE: Tiffin WTP Low Lift Pumps - 0915659
Tom,
Technically, the low lift pumps meet Hydraulic Institute Grade 2B. However, Clint is correct that there is a 4%
di2erence in performance between the certified performance curve vs. the test curve.
We are proposing to make up the di2erence in operating energy costs. Assuming 1000 hours run time per year per
pump @ $0.06 per KWH.
8.1 BHP @ design point x 0.04 = 0.324 BHP
0.324 BHP x .763 divided by 91.7% motor e2iciency = .27 KW
.27 KW x $0.06/KWH x 2000 hours of operation = $32.40 per year
$32.40 per year x 10 years = $324.00
We are proposing a $324.00 credit.
Advise if this seems reasonable.
3
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.