APPROXIMATE LOCATION OF REVISED FENCE ALIGNMENT 8' TOP OF TRANSORMER PAD ELEVATION = 689.00 PIPE BOLLARD (TYP. OF 2) 2' Changed to 4 bollards due to increased size of pad Added concrete strip to mount bollards