contract agreement · K-4
Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 18 of 63
Text read by the vision model; check the PDF for anything that matters.4 X 4 MESH
PAD DIMENSIONS
3/4" TO 1-1/2" FRAMING MATERIAL (Contractor to remove when concrete Set)
CONDUIT(S)
Conduits shall not be concreted in. An open window shall be present.
<table>
<tr>
<th rowspan="2">PAD</th>
<th colspan="2">SERVICE SIZE</th>
<th colspan="7">INCHES</th>
</tr>
<tr>
<th>XFMR KVA</th>
<th>208Y/120 AMPS</th>
<th>480Y/277 AMPS</th>
<th>A</th>
<th>B</th>
<th>C</th>
<th>D</th>
<th>E</th>
<th>F</th>
<th>G</th>
<th>H</th>
</tr>
<tr>
<td>I</td>
<td>75-300</td>
<td>100-1200</td>
<td>100-600</td>
<td>84</td>
<td>90</td>
<td>99</td>
<td>12</td>
<td>10</td>
<td>31</td>
<td>31</td>
<td>31</td>
</tr>
<tr>
<td>II</td>
<td>750-2500</td>
<td>1600-3000</td>
<td>800-3000</td>
<td>105</td>
<td>108</td>
<td>8</td>
<td>60</td>
<td>17</td>
<td>14</td>
<td>34</td>
<td>27</td>
</tr>
</table>
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.