contract agreement · K-4

Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4

Open the PDF Searchable (OCR) PDF

Page 18 of 63

Text read by the vision model; check the PDF for anything that matters.
4 X 4 MESH PAD DIMENSIONS 3/4" TO 1-1/2" FRAMING MATERIAL (Contractor to remove when concrete Set) CONDUIT(S) Conduits shall not be concreted in. An open window shall be present. <table> <tr> <th rowspan="2">PAD</th> <th colspan="2">SERVICE SIZE</th> <th colspan="7">INCHES</th> </tr> <tr> <th>XFMR KVA</th> <th>208Y/120 AMPS</th> <th>480Y/277 AMPS</th> <th>A</th> <th>B</th> <th>C</th> <th>D</th> <th>E</th> <th>F</th> <th>G</th> <th>H</th> </tr> <tr> <td>I</td> <td>75-300</td> <td>100-1200</td> <td>100-600</td> <td>84</td> <td>90</td> <td>99</td> <td>12</td> <td>10</td> <td>31</td> <td>31</td> <td>31</td> </tr> <tr> <td>II</td> <td>750-2500</td> <td>1600-3000</td> <td>800-3000</td> <td>105</td> <td>108</td> <td>8</td> <td>60</td> <td>17</td> <td>14</td> <td>34</td> <td>27</td> </tr> </table>

Sources

Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.