Text from the PDF text layer; check the PDF for anything that matters. XXft
Transformer Pad
10' 7'
Front
Bollards: typ. of 2
A
Transformer Pad Details:
Pad Size: 7' x 8' x 6"
Alliant requires 3' on back/sides of pad and 10' in front
Per plans there is 10' of space between New fence and new concrete paving
Alliant is requesting protective measures for the transformer now that it's inside the fencing
and adjacent to the concrete paving, such as bollards or other.