Text read by the vision model; check the PDF for anything that matters.RFI
To: Clint Wienen
MSA Professional Services
400 Ice Harbor Drive #110
Dubuque, IA 52001
Ph: (563)582-3973 Fax: (563)582-4020
CC: Tom Shedek (Tricon General Construction), Andy Knapp (Tricon General Construction)
Subject: Alliant Transformer Pad Relocation
Drawing: Sheet 05C102
Cost Impact: TBD
Spec Section: N/A
Schedule Impact: N/A
RFI #: 4
Date: 8/19/2025
Job: 25-012-IA Tiffin WTP
Phone:
Request:
With the transformer pad moving to the inside of the new project fence, please confirm the following items:
1. Confirm top of pad elevation.
2. Confirm specific pad location, location provided on plan view is based off of scaling the design plans and Alliant feedback.
3. Confirm if bollards are required. If so, please provide quantity, location, and type of bollards if needed (embedded, bolt down, etc.)
Requested by: Betty Keuter
Tricon General Construction
Date Required: 8/26/2025
Response:
Please see the attached drawing at the end of the RFI for clarification. Also please note that the new electric service will be 2000A. Therefore the transformer pad dimensions are to be 105"x108"x8".
Clint Wienen
Answered by
MSA
Company
8/20/2025
Date
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.