contract agreement · E-3
Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 71 of 72
Text from the PDF text layer; check the PDF for anything that matters. Job Truss Truss Type Qty Ply TIFFIN WATER TREATMENT PLANT / STRUCTURE 20
I82462245
26045-RO SD1A Hip Girder 2 3 Job Reference (optional)
Revoswel Truss & Lumber, LLC, Marion, IA - 52302, Run: 25.40 S Dec 15 2025 Print: 25.4.0 S Dec 15 2025 MiTek Industries, Inc. Thu Jun 04 14:23:28 Page: 2
ID:gmKcQHVBzW4iFTmHNOf?TMygiJF-uQd_q8LHu?niARLjhJyw4Zxn4NywAI?xe5Lse?z9e7D
6) TCLL: ASCE 7-16; Pr=20.0 psf (roof LL: Lum DOL=1.15
Plate DOL=1.15); Pg=25.0 psf; Pf=19.2 psf (Lum DOL =
1.15 Plate DOL = 1.15); Is=1.1; Rough Cat B; Partially
Exp.; Ce=1.0; Cs=1.00; Ct=1.00, Lu=30-0-0
7) Unbalanced snow loads have been considered for this
design.
8) This truss has been designed for greater of min roof live
load of 12.0 psf or 2.00 times flat roof load of 19.2 psf on
overhangs non-concurrent with other live loads.
9) WARNING: This long span truss requires extreme care
and experience for proper and safe handling and
erection. For general handling and erection guidance,
see Guide to Good Practice for Handling, Installing &
Bracing of Metal Plate Connected Wood Trusses
("BCSI"), jointly produced by SBCA and TPI. The building
owner or the owner’s authorized agent shall contract with
a qualified registered design professional for the design
and inspection of the temporary installation restraint/
bracing and the permanent individual truss member
restraint/bracing. MiTek assumes no responsibility for
truss manufacture, handling, erection, or bracing.
10) Provide adequate drainage to prevent water ponding.
11) All plates are MT20 plates unless otherwise indicated.
12) All plates are 2x4 (||) MT20 unless otherwise indicated.
13) Gable studs spaced at 2-0-0 oc.
14) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1080 lb uplift at
joint 2 and 1085 lb uplift at joint 18.
15) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSI/TPI 1.
16) Graphical purlin representation does not depict the size
or the orientation of the purlin along the top and/or
bottom chord.
17) Hanger(s) or other connection device(s) shall be provided
sufficient to support concentrated load(s) 1475 lb down
and 258 lb up at 8-0-0, 488 lb down and 62 lb up at
10-0-0, 556 lb down and 62 lb up at 12-0-0, 556 lb down
and 62 lb up at 14-0-0, 556 lb down and 62 lb up at
16-0-0, 556 lb down and 62 lb up at 18-0-0, 556 lb down
and 62 lb up at 20-0-0, 556 lb down and 62 lb up at
22-0-0, 556 lb down and 62 lb up at 24-0-0, 556 lb down
and 62 lb up at 26-0-0, 556 lb down and 62 lb up at
28-0-0, 556 lb down and 62 lb up at 30-0-0, 556 lb down
and 62 lb up at 32-0-0, 556 lb down and 62 lb up at
34-0-0, 556 lb down and 62 lb up at 36-0-0, 556 lb down
and 62 lb up at 38-0-0, 556 lb down and 62 lb up at
40-0-0, 603 lb down and 67 lb up at 41-8-4, 603 lb down
and 67 lb up at 44-3-12, 556 lb down and 62 lb up at
46-0-0, 556 lb down and 62 lb up at 48-0-0, and 488 lb
down and 62 lb up at 50-0-0, and 1475 lb down and 258
lb up at 52-0-0 on bottom chord. The design/selection of
such connection device(s) is the responsibility of others.
18) Studding applied to ply: 3(Back)
LOAD CASE(S) Standard
1) Dead + Snow (balanced): Lumber Increase=1.15, Plate
Increase=1.15
Uniform Loads (lb/ft)
Vert: 1-6=-59, 6-14=-59, 14-19=-59, 2-18=-20
Concentrated Loads (lb)
Vert: 32=-1458 (F), 31=-556 (F), 28=-556 (F),
25=-556 (F), 22=-556 (F), 21=-1458 (F), 29=-556 (F),
24=-556 (F), 93=-481 (F), 94=-556 (F), 95=-556 (F),
96=-556 (F), 97=-556 (F), 98=-556 (F), 99=-556 (F),
100=-556 (F), 101=-556 (F), 102=-556 (F), 103=-556
(F), 104=-603 (F), 105=-603 (F), 106=-556 (F),
107=-481 (F)
WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 1/2/2023 BEFORE USE.
Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the 16023 Swingley Ridge Rd.
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, and DSB-22 available from Truss Plate Institute (www.tpinst.org) Chesterfield, MO 63017
and BCSI Building Component Safety Information available from the Structural Building Component Association (www.sbcscomponents.com) 314.434.1200 / MiTek-US.com
Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.