Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 65 of 72
Text read by the vision model; check the PDF for anything that matters.ORDER ACKNOWLEDGMENT
0001497479
Account: TRIC1000 0017
Branch: 40CV
Phone: (563)-588-9516
Fax:
Bill To: Tricon General Construction
2245 Kerper Blvd
Suite #2
Dubuque, IA 52001
Ship To: Tricon General Construction
109 South Brown Street
Tiffin WTP
Tiffin, IA 52340
PO: Ref: Sheathing Job:
Order Date: 06/09/26 Exp Delv Date: 06/09/26 Sales Agents steves steves Type: WillCall Ordered By: Andy Ship Via: Will Call
<table>
<tr>
<th>QUANTITY</th>
<th>UOM</th>
<th>ITEM/DESCRIPTION</th>
<th>PRICE/UOM</th>
<th>AMOUNT</th>
</tr>
<tr>
<td>13</td>
<td>Each</td>
<td>osbtolko4850<br>4x8-1/2" OSB - Tolko (blue)<br>13/Each Loc:WHCenter</td>
<td>12.40/Each</td>
<td>161.20</td>
</tr>
<tr>
<td>3</td>
<td>Each</td>
<td>osbtolko4875tg<br>4x8-3/4" T&G Tolko OSB Blue Edge<br>3/Each Loc:WHCenter</td>
<td>18.94/Each</td>
<td>56.82</td>
</tr>
<tr>
<td colspan="4">Subtotal</td>
<td>218.02</td>
</tr>
<tr>
<td colspan="4">IA,Johnson,Coralville</td>
<td>13.08</td>
</tr>
</table>
Return Policy:
- Stock material can be returned up to 180 days after invoicing.
- All returns must be clean, uncut, no visible defects, and suitable for resale. Non-Sellable material will be disposed of.
- Beisser Lumber reserves the right to inspect material before issuing credit.
- Product sold in bundle, package, carton, pair, or set quantities must be returned in same quantities & unopen.
- Non-stock items, IF accepted for credit, a minimum 25% return charge will be assessed. NOTE: Substantial time delay when processing these credits, since we must first return the items to our supplier. Supplier will also inspect items before a credit can be processed. Delay times of three or more weeks are not unusual.
- Windows, Doors, & Prefinished Trim cannot be returned.
- Our return policy is subject to change without notice.
Payment Terms:
Due 10th of Following Month
Balance $231.10
Printed: 06/08/26 07:51:12
Weight: 16.00 Load: 16.00
Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.