contract agreement · E-3
Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 58 of 72
Text read by OCR; check the PDF for anything that matters.Neumiller Electric Change Order Request
BoctRame
General Contractor:
Ree
Tricon Construction
Neuiller Electri¢ Inc
& (319) 665-9036
COR #: #003 FULL SERVICE ELECTRICAL CONTRACTOR
COR Reference:
COR Description: Mini Split
Date: 7/2/2026
Approved
pp Yy by:
Nathan Phillips
Accepted by:
Material Total
Quoted Material Documentation attached S -
Itemized Material Documentation attached iS 82.23
Shipping Documentation attached S -
Handling Documentation attached S -
Expedition of material Documentation attached S$ -
Total S 82.23
Labor
Hours X S per Hour Total
Foreman 2.28 S 90.00 S 205.65
Journeyman 2.22 S 85.00 S 188.51
Apprentice 2.22 S 70.00 S 155.24
Project Management 0.20 S 100.00 S 20.16
Total S 569.56
Labor Overtime
Hours X S per Hour Total
Foreman 0.00 S 135.00 S -
Journeyman 0.00 S 127.50 S -
apprentice 0.00 S 105.00 S -
Project Management 0.00 S 150.00 S -
Total S -
Subcontractor Total
S$ .
§ -
Markup 5% S -
Total iS -
COR Cost S 651.78
COR Overhead 10% S 65.18
COR Profit 5% S 32.59
Tax 0% S -
Material/Equipment
New Labor
Description QTY New Unit Price Total Price Unit Total Labor
3/4" CONDUIT - PVC80 0.641395 19.24 0.0525 1.575
3/4" ELBOW 90 DEG - PVC80 6.21129 S 12.42 0.2725 0.545
3/4" COUPLING - PVC 0.33169 S 2.65 0.15 1.2
3/4" 2-H STRAP - PVC 0.83029 $ 4.98 0.075 0.45
#12 THHN BLACK 0.27311 S 36.05 0.00644 0.85008
#14 THHN GREEN 0.17069 S$ 5.63 0.00538 0.17754
#8 TO #10x 7/8 PLAS ANCHOR (3/16) 0.0898] S 0.54 0.075 0.45
#10x 1 P/H SELF-TAP SCREW 0.11889 S 0.71 0.0375 0.225
2" DIAM CORE 5" THICK FLOOR 0.00009 $ - 0.75 0.75
FALSE S - FALSE 0
FALSE S - FALSE 0
FALSE S - FALSE 0
FALSE S - FALSE 0
FALSE S - FALSE 0
FALSE S - FALSE 0
FALSE S - FALSE 0
FALSE S - FALSE 0
Total S 82.23 | 6.22262
Productivity Factors
[Percentage of Loss | [Additional Labor |
Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.