contract agreement · E-3
Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade — E-3
Page 56 of 72
Text read by the vision model; check the PDF for anything that matters.DMW2 LED Wet Location
OPTIONS AND ACCESSORIES
The DMW2 Series fixture offers numerous options for almost every electrical and optical component, including a long list of field-installable accessories.
rSBOR/SBOR – Fixture Mount Sensor (see www.sensorswitch.com for additional information)
• 360° coverage
• On/Off dim
• Photocell optional
• IP66 rated
• Photocell and 0-10VDC dimming options.
<table>
<tr>
<th>Fixture sensor nomenclature</th>
<th>RSBOR/SBOR sensor nomenclature</th>
</tr>
<tr>
<td colspan="2">For shortest lead times use one of the following SBOR configurations</td>
</tr>
<tr>
<td>NLTAIR2 RSBOR10</td>
<td>RSBOR 10 EB4 WH G2</td>
</tr>
<tr>
<td>MS110NWL</td>
<td>SBOR 10 OEX EB4 WH</td>
</tr>
<tr>
<td>MS1102L3VWL</td>
<td>SBOR 10 OEX D EB4 WH 3V</td>
</tr>
<tr>
<td>MS110NWLDSCNWL</td>
<td>SBOR 10 OEX P EB4 WH</td>
</tr>
</table>
Sources
- revize: E-3 (DSuxr8xIE877VnS5HXwn1QE22BJNy9.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E-3 Approval of Change Order #3 – Tricon Construction Group – Water Treatment Facility Upgrade
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.