ordinance · H-1

H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD

Open the PDF Searchable (OCR) PDF

Page 60 of 67

Text read by the vision model; check the PDF for anything that matters.
BASEMENT NOTES: - ALL SHADED FLOORING AREAS ARE SHOWN UNLESS OTHERWISE NOTED. - FOR ADDITIONAL NOTES SEE GENERAL NOTES ON TITLE SHEET AND DETAILS. - NICKEL HEAD BOLTS. - REFER TO ELEVATIONS FOR ELEVATION. - PROVIDE FIREPROOFING PER LOCAL CODES. - PROVIDE MECHANICAL ROOMS IN ALL BASEMENTS TO HAVE A CLEAR HEIGHT OF 6' AT THE HIGH POINT AND 2' MINIMUM AT 2' FROM THE FLOOR. - ALL ELECTRICAL AND MECHANICAL EQUIPMENT AND MACHINES ARE SUBJECT TO RELOCATION IF FIELD CONDITIONS REQUIRE TO VERIFY. - SEE ELEVATIONS FOR ADDITIONAL INFORMATION NOT SHOWN IN THIS PLAN. - VERIFY ALL DOOR TYPICAL HEIGHTS TO BASE SURFACE. - SEE ELEVATIONS FOR ADDITIONAL INFORMATION NOT SHOWN IN THIS PLAN. - SEE ALL STAIRS AND HANDRAILS MATERIAL, AWAY FROM BUILDING TYPICAL. - SEE GARAGE FLOOR UPTO FOOT TO GARAGE DOOR OPENING. - SEE ELEVATIONS FOR ADDITIONAL INFORMATION NOT SHOWN IN THIS PLAN. - SEE ALL DRAINAGE FOR FINAL SURFACE ELEVATIONS. - TOP OF SLAB AT BEAM/SLAB JOINTS 5/8" DEEP AT THE NORTH OF THE DOOR OPENING. REFER TO ELEVATION 3D2 FOR PROVIDE A SUPPRESSED REINFORCEMENT. KEY NOTES: 1. LINE OF SUB-GLAZE 2. LINE OF FINISHED FLOOR ABOVE 3. BRUSH STAIRS AND LANDING 4. BRUSH STAIRS AND LANDING (SEE ELEVATIONS FOR FINISHES AND OTHER ACCESSIBLE AREAS PER LOCAL CODES) 5. SEE ELEVATIONS FOR ADDITIONAL INFORMATION NOT SHOWN IN THIS PLAN. 6. SUPPLY LOCATION (SEE MECHANICAL DRAWINGS) 7. SEE MECHANICAL DRAWINGS 8. SEE MECHANICAL DRAWINGS 9. SEE MECHANICAL DRAWINGS 10. SEE MECHANICAL DRAWINGS 11. SEE MECHANICAL DRAWINGS 12. SEE MECHANICAL DRAWINGS 7'-4 1/2" STAIR NOTE: USE 10" X 10" X 1/2" WOOD SUBLOOM INTERIOR STAIRS AT 16" O.C. = 40 TOTAL RISER VERT. 8'-4 1/2" STAIR NOTE: USE 10" X 10" X 1/2" WOOD SUBLOOM INTERIOR STAIRS AT 16" O.C. = 40 TOTAL RISER VERT. COMPLIANCE OF FIRE PROTECTION OF FLOORS PER SECTION 5003 DIRECT-VIT APPLIANCES ARE TO BE RELOCATED PER LOCAL CODE. TO GL SEPARATION CONNECT TO FOUNDATION DRAINAGE SYSTEM BASICS HONOR ALL AS REQUIRED BY LOCAL CODES, CONDITIONS VARY BY SITE AND HOUSE TYPE. unfinished basement 7'-4 1/2" clg Opt Look-Out Basement Plan SCALE: 1/8"=1' AT 22"X28" LAYOUT 1/8"=1' AT 18"X24" LAYOUT unfinishd basement 7'-4 1/2" clg Opt Walk-Out Basement Plan SCALE: 1/8"=1' AT 22"X28" LAYOUT 1/8"=1' AT 18"X24" LAYOUT unfinishd basement 7'-4 1/2" clg unfinishd basement 7'-4 1/2" clg PORCH SLAB REQUIRE FOR LOCAL CODE AND ENGINEERS SPECIFICATION. GARAGE SLAB REQUIRE FOR LOCAL CODE AND ENGINEERS SPECIFICATION. MAIN SLAB REQUIRE FOR LOCAL CODE AND ENGINEERS SPECIFICATION. BEAMS UNDER ALL LOAD BEARING WALLS. VERIFY ALL GRADE BEAMS PRIOR TO POURING CONCRETE. STEP BY STEP DRAWINGS SEE ELEVATIONS PROVIDE MATERIAL AND FINISHES PER LOCAL CODE. STEPS MAY OCCUR SEE ELEVATIONS PROVIDE MATERIAL AND FINISHES PER LOCAL CODE. BASEMENT PLAN 'A'/B' SCALE: 1/8"=1' AT 22"X28" LAYOUT 1/8"=1' AT 18"X24" LAYOUT Duplex Series Master Set (Iowa) FOR CONSTRUCTION PRINT DATE: September 25, 2020 PRINTED BY: A1.4

Sources

  • sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.