ordinance · H-1

H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD

Open the PDF Searchable (OCR) PDF

Page 49 of 67

Text read by OCR; check the PDF for anything that matters.
lO'xIO! DECK AT OPTIONAL L/o # WO __ _ SEE OPTIONAL BASEMENT | COVERED DECK | AT SHT A23 24-0" lo'-o" | Eee #--- fe | } | 13-8" 25'-4" 5| 3-6" lo-2" 6-0" , 6-8" , ottiot , 5-0" Q| T'-4 |/2" STAIR NOTE: d'-|" STAIR NOTE: 7x5" CONG | enoH TJLWITH 3/4" renee SUBFLOOR) (USE 14" TJIWITH 3/4" Pewncor SUBFLOOR) ou PATIO | 8Ree,Ay +/- ceo= VolVat" TOTAL I5 RISERS AT +/- 7.45" = Il ad TOTAL 14 TREADS AT 10" EACH VEt | RISE VERIFY | 3060 SH 30p0 SH 30f0 SH —___—_—_—_—— > 4 ———, ———__—__—_—_——_> a T 2-4" 6068 S6D al ey) id 8'-4 |/2" STAIR NOTE: q'-|" STAIR NO I (USE 14" Tl WITH 3/4" PLYWOOD SUBFLOOR) (USE 14" TJI WITH 3/4" PLYWOOD eUBFLOOR) | I5 TREADS AT 10" EACH VERIFY I6 TREADS AT |O" EACH VERIFY 44h, a NO: | DATE: REVISION: .x r| |i195s great rm casual dinin 16 RISERS AT +/- 7.64" = 122 1/4" TOTAL IT RISERS AT +/- 1.28" = 123 3/4" TOTAL RISE VERIFY RISE VERIFY IQ AN 0413.21 Bl" clg > BI" cl > X ~! ly a g 2 fi) 9| it S | 19: | 15 y | 44 —E - FOR ADDITIONAL NOTES SEE GENERAL NOTES ON TITLE SHEET AND DETAILS. i 4-4 - WINDOW HEAD HEIGHTS: a] 5" 8 IST FLOOR = 1'-O" UN.O. ON ELEVATIONS. “ye itt . gy 2ND FLOOR = T'-O" UNO. ON ELEVATIONS. ALL DIMENSIONS TO WINDOWS AND DOORS ARE TO CENTERLINE. ca) i 4 5 R PROFESSIONAL SEAL: B 9 64 L 1S) . 610 . a | 436" ISLAND __| WALL LEGEND: x a PULL HEIGHT FL Hele HEIGHT ® 2X4 WOOD STUD PARTITION 2X6 WOOD STUD PARTITION ys | 2 1 4 , © Ps _|2 LLL - IRIS % 2-44 : ‘STUD WALL BELON BRICK / STONE VENEER HEIGHT AND STUD SIZE AS NOTED a e2zoI . PROVI ee LOW GYPSUM BOARD WALL. DRYWALL OPENING. HEIGHT RIGID 8 16 PROJECT TITLE: HEIGHT AND STUD SIZE AS NOTED AS NOTED ON PLAN. ING 2 PANTRY BEHIND oye Lot 4 a $& z 2 KEY NOTES: TUB/SHONER ual 5° 40' Series FIRE PROTECTION: PER BUILDER =— ky [1] HOUSE TO GARAGE FIRE SEPARATION. GARAGE/HOUSE SEPARATION . i=] zal ay in X450 AT VERTICAL SURFACES SHALL BE PROTECTED WITH ONE (I) LAYER |/2" GYPSUM BOARD. (PER LOCAL CODES) B ° Dy Ls RIS iB Master Set GARAGE/HOUSE SEPARATION AT HORIZONTIAL SURFACES (lowa) TYPE 'X' GYPSUM BOARD. (PER LOCALTove) SHALL BE PROTECTED WITH ONE (1) Li 5/6" | Hay PN i ths . HOUSE TO GARAGE DOOR SEPARATION PROVIDE I-3/8" SOLID RATED DOOR. (PER LOCAL cous) i] CORE DOOR OR APPROVED 2 = 8 z BENEATH STAIRS AND LANDINGS. I/2" GYPSUM BOARD x b ON WALLS AND CEILING OF ENCLOSED ACCESSIBLE AREAS. (PER LOCAL CODES) eal _ STEPS MAY OCCUR, | SEE CIVIL DRAWINGS, © [> F = 2) MEP'S 1 Leh IDE HANDRAIL 8 = | | AND GUARDRAIL PER 8 io (3) WATER HEATER, PER LOCAL CODES vaya LJ sya LOCAL CODE. ra 4a Wy 4-2" > W-4" VA a = [6] A/C CONDENSER PAD. (VERIFY) SEE OPTIONAL 3RD CAR <x xy OG" DION pa - 2 x a2 {e) PRE-FABRICATED METAL FIREPLACE. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS. CORAGE AT SHT garage ib VANITY 1 PROVIDE RIGID BACKING BEHIND 25 [2] ATTIC ACCESS- REMOVABLE 22'X30" PANEL. SEE OPTIONAL im) TUB/SHOWER PER tw ENLARGED 3RD “~ BUILDER MINIMUM 30" CLEAR HEADROOM ABOVE ACCESS OPENING. > CAR GARAGE AT} 8 t CLIENTS NAME: a a a 20'-6" Wh [ 5.4" SHT A23 a lhe TYPICALS: 7 [4] TEMPERED SAFETY GLASS. (PER LOCAL CODES) ref ..\Floor2partials.dng 4 PLYWOOD SHELF ABOVE WITH DRYWALL FINISH OVER. HEIGHT AS NOTED. + 4 3 [1] HALF WALL, HEIGHT AS NOTED. INTERIOR SOFFITS: FFL = T'-6" UNO. SFL = T'-6" UN.O. porch —|—- 8'-I" clg PROIECTNO: GMD-GAIIO48 Es} § oO SHEET TITLE: SOFFIT] *X450° I6ON10 SECTIONAL SEE EXT ELEV A 1st FLOOR ACRYLIC TUB W CERAMIC PLATFORM | —* F——4 Ly p= PLAN '4EGF' KITCHEN: MASONRY VENEER ——| AT ELEV 'A-2', + PTIONAL 30" SLIDE-IN RANGE, PACKAGE PER BUILDER 'A-3', AND 'A-4! 2-3" 16-0" 23" 2-10" 2" VENT PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 20-6" 4-6" 14.0" [ie] 30" GAS COOKTOP AND HOOD. VENT PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 3q'-0" PRINT DATE: [Ia] ELECTRIC OVEN WITH MICROWAVE OVEN. Sept 20, 2019 Ist Floor Plan ‘A’ at Opt Basement ‘SHEET NO: SCALE: |/4"=|'-O" AT 22"X34" LAYOUT W/6"=1'-O" AT II"XIT" LAYOUT A2.1

Sources

  • sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.