Text read by the vision model; check the PDF for anything that matters.BASEMENT NOTES:
- ALL AREAS PERIMETERED AS SHOWN (SIZES OTHERWISE NOTED)
- FOR ADDITIONAL NOTES SEE GENERAL NOTES OR TITLE SHEET AND DETAILS.
- MINIMUM HEAD HEIGHTS:
- BASEMENT CEILING TO ELEVATION
- PROVIDE FIRESTOPPING, PER LOCAL CODES
- MINIMUM SUPPLIER TO VERIFY AT LEAST ONE WINDOW IN ALL DEPARTURES TO HAVE A NET OPENING OF AT LEAST 54" X 27". MINIMUM CLEARANCE OF 24" IN HEIGHT AND 30" IN WIDTH SHALL NOT BE LESS THAN 4' ABOVE FLOOR. PER LOCAL CODES
- ALL WALLS SHALL BE REINFORCED WITH REBAR, PER LOCAL CODES. SEE DETAIL FOR RELOCATIONS. SEE FIELD CONSTRUCTION CONTRACTOR TO VERIFY.
- REFER TO STRUCTURAL ENGINEERING DRAWINGS SHOWN ON THIS PLAN.
- SEE PLUMBING AND MECHANICAL DRAWINGS FOR SIZING OF DRAINAGE SYSTEMS.
- SEE 3/4" MAX AT REAR DOORS. PER LOCAL CODES.
- SEE GARAGE DOOR OPENING SIZE AND LOCATION. SEE DETAIL.
- SEE GARAGE DOOR OPENING SIZE AND LOCATION. SEE DETAIL.
- SEE GARAGE DOOR OPENING SIZE AND LOCATION. SEE DETAIL.
- SEE GARAGE DOOR OPENING SIZE AND LOCATION. SEE DETAIL.
KEY NOTES:
- LINE OF SLAB ABOVE
- LINE OF REBAR HALL-DOORS
- PROVIDE 1/8" X 1/8" X 1/8" LATH AND 1/2" X 1/2" X 1/2" WOOD FRAMING ON WALLS AND CEILINGS. SEE DETAIL FOR ACCESSIBLE AREAS. PER LOCAL CODES
- NA
- SEE PIPES/PLUMBING RESEARCH AND ENGINEERING DRAWINGS
- SEE HEATER AND FLOOR DRAIN, SEE DETAIL
- SEE STORAGE SPACE INSTALL PER ARCHITECT'S INTERPRETATIONS. SEE DETAIL FOR MECHANICAL DRAWINGS
- SEE RESEARCH SAFETY ALARMS, PER LOCAL CODES
- SEE RESEARCH CONTROL
- SEE RESEARCH RESEARCH
- SEE RESEARCH RESEARCH
- SEE RESEARCH RESEARCH
- SEE RESEARCH RESEARCH
- SEE RESEARCH RESEARCH
- SEE RESEARCH RESEARCH
7'-4 1/2" STAIR NOTE:
USE #1 TREADS AT 17" EACH (PERF)
#1 TREADS AT 17" EACH = 121 TOTAL
SEE DETAIL
8'-4 1/2" STAIR NOTE:
USE #1 TREADS AT 17" EACH (PERF)
#1 TREADS AT 17" EACH = 121 TOTAL
SEE DETAIL
COMPLIANCE OF FIRE PROTECTION OF FLOORS PER DETAIL 522 B
STAIRS AND RAILINGS ARE TO BE PER LOCAL CODES
unfinished basement
7'-4 1/2" clg
Opt Look-Out Basement Plan
SCALE: 1/8"=1'-0" AT 22'5/8" LAYOUT 1/8"=1'-0" AT 19'5/8" LAYOUT
unfinished basement
7'-4 1/2" clg
Opt Walk-Out Basement Plan
SCALE: 1/8"=1'-0" AT 22'5/8" LAYOUT 1/8"=1'-0" AT 19'5/8" LAYOUT
GARAGE SLAB
RESEARCH FOR LOCAL CODE AND ENGINEER SPECIFICATION
GARAGE SLAB
RESEARCH FOR LOCAL CODE AND ENGINEER SPECIFICATION
Opt Oversized 3 Car Garage
SCALE: 1/8"=1'-0" AT 22'5/8" LAYOUT 1/8"=1'-0" AT 19'5/8" LAYOUT
Opt 3rd Car Garage
SCALE: 1/8"=1'-0" AT 22'5/8" LAYOUT 1/8"=1'-0" AT 19'5/8" LAYOUT
Sources
- sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.