ordinance · H-1
H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD
Dated April 5, 2022City Council — regular meeting, April 5, 2022 67 pages
Ord. 2022-492, Ord. 2021-492
Page 47 of 67
Text read by the vision model; check the PDF for anything that matters.BASEMENT NOTES:
- ALL ANCHOR FASTENERS ARE TO BE RECORDED UNLESS OTHERWISE NOTED.
- FOR ADDITIONAL NOTES SEE GENERAL NOTES ON TITLE SHEET AND DETAILS.
- SEE ELEVATION SHEETS FOR FLOOR FINISHES.
- PROVIDE PRELIMINARY PER LOCAL CODES.
- PROVIDE MECHANICAL AND ELECTRICAL SYSTEMS IN THE MIRROR NAIL RESEARCH TO HAVE A CLEAR OPENING OF 36" X 48" AT THE DIMENSION OF 24" FROM HEAT AND 20" FROM ELECTRICAL OUTLET. ALL ELECTRICAL AND MECHANICAL EQUIPMENT AND MACHINES ARE SUBJECT TO RELOCATION DUE TO FIELD CONDITIONS. CONTRACTOR TO VERIFY.
- SEE ELEVATIONS FOR FINISH SURFACE ELEVATIONS SHOWN ON THE PLAN.
- VERIFY ALL DOOR THRESHOLD HEIGHT TO HARD SURFACES.
- REMOVE ALL COOPS AND WASTE CATCHER MATERIAL AWAY FROM BUILDING - TYPICAL.
- SLOPE GARAGE FLOOR UNTIL POST TO GARAGE DOOR OPENING.
- PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
- REFER TO CIVIL DRAWINGS FOR FINISH SURFACE ELEVATIONS.
- TOP STOOP AT MAIN/SLIDER DOORS 1/4" DEEP BY THE WIDTH OF THE DOOR.
- PROVIDE INTERIOR ROOF DETAIL TO PROVIDE A DRY MECHANICAL ROOM.
KEY NOTES:
1. LINE OF SLAB ABOVE
2. LINE OF FRAME WALL ABOVE
3. HUMIDITY STAIRS AND LANDING
4. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
5. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
6. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
7. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
8. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
9. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
10. PROVIDE DRAINAGE SYSTEM FOR GARAGE FLOOR AND EXPOSED CONCRETE.
COMPLIANCE OF FIRE PROTECTION OF FLOORS PER RC SECTION 302.20
DIRECT-VENT APPLIANCES ARE TO BE DEEP PER LOCAL CODES
7'-4 1/2" STAIR NOTE:
SEE H-13 HOMES "PULLHOUSE" SERIES.
THREE AT EACH EDGE VERIFY.
NO HAND RAIL - SEE - NO HAND RAIL.
SEE VERIFY.
8'-4 1/2" STAIR NOTE:
SEE H-13 HOMES "PULLHOUSE" SERIES.
THREE AT EACH EDGE VERIFY.
NO HAND RAIL - SEE - NO HAND RAIL.
SEE VERIFY.
unfinished basement
7'-4 1/2" slg
GARAGE SLAB
STEPS MAY OCCUR. SEE CIVIL DRAWINGS. PROVIDE HANDRAIL AND GUARDRAIL FOR LOCAL CODES.
PORCH SLAB
REMOVE PER LOCAL CODES AND ENGINEERS SPECIFICATION.
CONNECTION TO FOUNDATION PIPING SYSTEM
CONNECT TO FOUNDATION PIPING SYSTEM
MAIN SLAB
BASEMENT PLAN 'A'
SCALE: 1/8"=1' AT 2ND FLOOR LAYOUT 1/8"=1' AT 1ST FLOOR LAYOUT
FOR CONSTRUCTION
PROJECT: GMD-GAR4040
SERIES: 'X450'
BASEMENT PLAN '4EGF'
PRINT DATE: Sept 20, 2019
A1.6
Sources
- sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (H-1 - Ordinance 2022-492 - Rezone Prairie Village Part 3 - R-1A, R-2, R-4, R-1E to R-1D-OPD, R-2-OPD, R-4-OPD.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.