Resolution
Resolution 2017-072
Authorizing Hart-Frederick Consultants P.C. Project Engineer to Proceed with the Design, Necessary Permits, Publications and Submittal to the Iowa Department of Transportation for Review for the Pedestrian Sidewalk/Tunnel Redesign Project for the City of Tiffin, Iowa
adopted · Sep 5, 2017
Timeline
| Date | Step | Recorded in | Motion and votes |
|---|---|---|---|
| Sep 5, 2017 | adopted | minutes meeting 2017-09-05 document |
Motion to approve Resolution 2017-072 – A Resolution Authorizing Hart-Frederick Consultants P.C. Project Engineer to Proceed with the Design, Necessary Permits, Publications and Submittal to the Iowa Department of Transportation for Review for the Pedestrian Sidewalk/Tunnel Redesign Project for the City of Tiffin,... moved Bartels, seconded Havens: carried 5 ayes |
| not dated | signed | signed document document a date in its text (2017-10-03) is not the adoption date |
A Resolution Authorizing Hart-frederick Consultants P.c. Project Engineer to Proceed with the Design, Necessary Permits, Publications and Submittal to the Iowa Department of Transportation for Review for the Pedestrian Sidewalk/tunnel Redesign Project for the City of Tiffin, Iowa |
Documents
Signed copy
- Resolutions-2017-072 2017-10-03 · laserfiche · PDF
Agendas and minutes citing it
- Minutes-9/5/2017 2017-09-05 · laserfiche · PDF
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.