contract agreement · K-4
Consideration of Change Order #1 – Tricon Construction Group, Water Treatment Plant Upgrade – Motion to Approve
Page 6 of 7
Text from the PDF text layer; check the PDF for anything that matters. 1. Cubicle 3B to be repurposed for 20-EUH-1, 5KW Chlorine Room Heater
2. Cubicle 3C to be repurposed for 20-EUH-2, 5KW Caustic Room Heater.
3. Cubicle 3D to be repurposed for 20-EUH-3, 5KW Anti-Scale Room Heater.
4. Cubicle 3E to be repurposed for 20-EUH-4, 3KW Flow Room Heater.
5. Cubicle 3F to be repurposed for 20-EUH-5, 3KW Aerator Pit Heater.
Electrical Distribution Equipment Modifications
E Four (4) Panelboard Modifications as required per Construction Bulletin 1, as specified in Section 26 24 16 and as detailed
below.
1. 30-PP-1, Modifications to include supplying the following breakers
1. Replace (3) 125 Amp, 3-pole breakers with (3) 175 Amp, 3-pole breakers.
2. 20-LP-1A, Modifications to include replacing original 100 Amp MCB with new 200 Amp MCB and supplying the
following breakers.
1. (1) 100 Amp, 3-pole
2. (1) 25 Amp, 2-pole
3. (1) 20 Amp, 2-pole
4. (35) 20 Amp, 1-pole
3. 20-LP-1B, Modifications to include supplying the following breakers.
1. (42) 20 Amp, 1-pole
4. 30-LP-1, Modifications include supplying the following breakers.
1. Replace (1) 25 Amp, 2-pole breaker with (1) 20 Amp, 2-pole breaker.
General Conditions
F One (1) Professional Services to include engineering, PLC programming, HMI/SCADA development, and on-site services to
include startup, testing, and operator training.
Your net price for the above items, FOB factory with freight allowed to jobsite including one (1) year
warranty from date of startup (not to exceed 18 months from date of shipment).......... $ 11,600.00 excluding
taxes
The above pricing does not include any of the following:
1. Sales or use taxes.
2. Bond costs.
3. License fees or permits of any kind.
4. Light pole for antenna mounting.
5. Sump panel or associated control panel or floats.
6. Disconnect switches of any kind.
7. Panelboards.
8. Transformers.
9. Fiber Optic Cable, connectors, or associated installation and testing.
10. Interconnecting wire, cables, or conduits between control panels/MCCs and primary devices.
11. Generator sets of any kind.
12. Automatic Transfer Switches of any kind.
13. Generator control panels or receptacles.
14. Temporary electric services or equipment.
15. Final termination of customer terminal connections.
16. Setting or mounting of any control panels/MCCs or primary devices.
17. Wall or floor stands or mounting supports for primary devices.
18. Concrete housekeeping pads.
19.
2 of 3
Sources
- revize: Attachment (3R1W5VEOEnpDNmpsjgVCBtNRV1vLLn.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-4 - Change Order 1 - Tricon - Water Treatment Plant.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Consideration of Change Order #1 – Tricon Construction Group, Water Treatment Plant...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.