contract agreement · K-4
Consideration of Change Order #1 – Tricon Construction Group, Water Treatment Plant Upgrade – Motion to Approve
Page 7 of 7
Text from the PDF text layer; check the PDF for anything that matters. 19. Valve actuators or solenoid valves of any kind.
20. Pressure or differential pressure gauges of any kind.
21. Pad mounted transformers.
22. Grounding of equipment.
23. Exterior Lighting control equipment or Time Clocks.
24. Mounting hardware or brackets.
25. Removal or disposal of existing equipment or reconnection of existing equipment.
26. Unloading equipment from delivery trucks or on-site storage thereof.
27. Power Company metering socket or equipment or associated utility fees.
28. Building light fixtures, light poles, switches, receptacles, junction or pull boxes or galvanized hubs of any kind.
29. Installation of any kind.
30. Labor or any other miscellaneous materials that may be required for installation not specifically detailed above.
Respectfully submitted,
AUTOMATIC SYSTEMS CO.
Jake McFarland
[email protected]
To expedite handling and confirmation, you may sign below and forward as your order for the equipment
quoted above.
Total Net Price
Purchase Order No.
Customer/Firm Name
Items Ordered Authorized By
3 of 3
Sources
- revize: Attachment (3R1W5VEOEnpDNmpsjgVCBtNRV1vLLn.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (K-4 - Change Order 1 - Tricon - Water Treatment Plant.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Consideration of Change Order #1 – Tricon Construction Group, Water Treatment Plant...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.