staff report memo · L-2
Miron - Project Update - Tiffin Recreation Center
Page 17 of 19
Text from the PDF text layer; check the PDF for anything that matters. Tiffin Community Recreation Center Layout Name: 250120B
Construction Schedule Update 09/05/2025
Miron Construction Co., Inc. Data Date: 05-Sep-25
Page 4 of 6
250120-15PM 20250905
Activity ID Resp PredecessorsSuccessors Activity Name Orig Rem Start Finish 2025 2026
Dur Dur Nov
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
1370 MERIT 1240, 1450, Erect PEMB 20 20 19-Nov-25 17-Dec-25
2750, 2000,
1590 MIRON CONC 2760,
2790 1440,
2850 Form and Pour Exterior Equipment Pads 5 5 21-Nov-25 28-Nov-25
2000 SEEHASE 1370, 2380, Interior CMU Bearing Walls 5 5 04-Dec-25 10-Dec-25
2820 1470
1470 SEEHASE 2820, 1620 Interior Non-Bearing CMU Block 10 10 10-Dec-25 23-Dec-25
2000
1450 MERIT 1370 1390, Roofing 15 15 11-Dec-25 02-Jan-26
2780
2370 TSF 2290, 2390 Steel - Sequence 3 High Steel Install 11 11 15-Dec-25 30-Dec-25
1370
1440 MERIT 1370 2110, Exterior Metal Panels 30 30 18-Dec-25 30-Jan-26
1870,
2850 ILTENS 1590, 2520,
2430 RTU Setting 2 2 08-Jan-26 09-Jan-26
1690
2380 TSF 2300, 2440 Steel - Sequence 4 Columns/Beams 8 8 19-Jan-26 28-Jan-26
2000,
2440 TSF 1370,
2380 2450 Steel - Sequence 4 Joist/Detailing 10 10 29-Jan-26 11-Feb-26
2460 TSF 2390 2470 Steel - Sequence 5 Beams/Channels 9 9 30-Jan-26 11-Feb-26
2110 AAAMECH 1440 1990 MEP Inwall Rough In - Exterior PEMB Walls 10 10 02-Feb-26 13-Feb-26
2520 ZEPHYR 1440 2510 Curtain Wall/Aluminum Entrance/Glazing - Field Verification 1 1 02-Feb-26 02-Feb-26
2780 GENTRADES 1450, 1430, Temp Heat 10 10 02-Feb-26 13-Feb-26
1440 1390
2470 TSF 2460 2480 Steel - Sequence 5 Detailing 4 4 04-Feb-26 09-Feb-26
2450 TSF 2440 2390, Steel - Sequence 4 Metal Decking 4 4 05-Feb-26 10-Feb-26
1430
2480 TSF 2470 2400, Steel - Sequence 5 Decking 4 4 10-Feb-26 13-Feb-26
1980
2390 TSF 2310, 2460 Steel - Sequence 5 Track Rods 2 2 11-Feb-26 12-Feb-26
2450,
1430 MIRON CONC 2370
2450, 1550, Prep/Pour/Strip 2nd Floor to GL 5 5 5 16-Feb-26 20-Feb-26
2780 1570,
2400 TSF 2480, 1840,
2410 Steel - Sequence 6 Main Stair Install/Detail 5 5 23-Feb-26 27-Feb-26
2320
1980 MIRON CONC 2480, 1390 Prep/Pour/Strip 2nd Floor GL5 East and Track 5 5 23-Feb-26 27-Feb-26
1430
1410 MIRON 1390 Preinstall - Gym Floor and Slab on Grade 0 0 23-Feb-26
1390 MIRON CONC 1450, 1970, Prep/Pour/Strip Slab on Grade - Gym Floor (Orange) 5 5 02-Mar-26 06-Mar-26
2780, 1360,
1550 PEARSON 1980,
1430 1580
1560 2nd Floor Interior Steel Stud Framing 5 5 02-Mar-26 06-Mar-26
1570 AAAMECH 1430 1560, 2nd Floor Overhead Rough In - MEP 8 8 02-Mar-26 11-Mar-26
1580
1840 GLAZING 1430, 1600, Glazing 15 15 02-Mar-26 20-Mar-26
2510, 1940
2420 TSF 2530
2410, 1680 Steel - Sequence 8 Running Track Railing Instal 7 7 03-Mar-26 11-Mar-26
2340
1970 MIRON 1390 1720 Gym Floor Moisture Mitigation 40 40 09-Mar-26 01-May-26
1360 MIRON CONC 1390 2840, Prep/Pour/Strip Slab on Grade - Brown 1 1 09-Mar-26 09-Mar-26
1520,
2840 MIRON CONC 1360 1540
2830 Prep/Pour/Strip Slab on Grade - Pink 1 1 10-Mar-26 10-Mar-26
2830 MIRON CONC 2840 1990, Prep/Pour/Strip Slab on Grade - Teal 1 1 11-Mar-26 11-Mar-26
2410
1560 AAAMECH 1550, 1660 2nd Floor In Wall Rough In - MEP 5 5 12-Mar-26 18-Mar-26
1570
Actual Work Please review the activities for which you are responsible and the relationships to the activities of other
Remaining Work trades. If you have questions or comments, please contact Patrick Myers & Corey Boyles immediately. If
Critical Remaining Work we receive no comments from you by 5 workings days, we will assume a lack of response to be your
Milestone agreement and commitment to the durations, relationships, and sequencing of this plan. As always, we will
attempt to improve upon the dates shown. Periodic updates will be distributed as the project progresses.
Sources
- revize: Attachment (v9PaS6A2oWkWF59ibVczjSuzrOcrMO.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (L-2 - Miron - Project Update.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: Miron - Project Update - Tiffin Recreation Center
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.