packet
Packet: Tiffin Regular City Council Meeting (12/16/2025)
Dated December 16, 2025City Council — regular meeting, December 16, 2025 141 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-092, Res. 2025-093, Res. 2025-094
Page 51 of 141
Text from the PDF text layer; check the PDF for anything that matters. COPYRIGHT PROTECTION UNDER FEDERAL LAW (TITLE 17, U.S. CODE)
Above law limits the use of this document (drawing/data) to this specific project only, and duplication whole or in part for use on other than this project is prohibited.
E MARENGO R
OAD / HWY 6
1
70
702
703
704
706
705
70
5 706 703
702
701
701
704
703
699
702
699
W
700
AUTUMN SPLEND
OR DRIVE 699
701
700
698
699
698
699
698
697
696
695
694
697
STEPHANS STREET
700
698
700
GROVE PARK WAY
699
696
TREE WAY
HARVEST GOLD WAY
COFFEE
698
698
697
696
697
697
695
695
690
695
6
69
696
694
694
696
4
POND VIEW DRIVE
5 69
69
693
694
687
695
694
679 PROPOSED
STORM WATER BASIN 680
691
693
692 686 69
3
686
693 687
69
69 2 691
1 VARIES (21' OR 26')
691 3' 3'
SEE PLANS
T 688
STREE 688
E 2ND VARIES (10.5' OR 13')
7" PCC
VARIES (10.5' OR 13')
6" STANDARD CURB 6" STANDARD CURB
PAVEMENT
2.0% 2.0%
Z:\2024\24317\DRAWINGS\BASE\24317 C-LINE.DWG, 2 OF 3, 10/31/2025 6:31:20 PM
6" MODIFIED
SUBBASE
ROAD TYPICAL SECTION
H ADDRESS CITY COMMENTS 10-31-25 CLIENT PROJECT SHEET TITLE PROJECT NUMBER: SHEET NUMBER
G ADDRESS CITY COMMENTS 10-13-25
Shoemaker PACE CONSTRUCTION, LLC GROVE PARK ROWHOMES PRELIMINARY PLAT 24317
0 20 40 60 80
F REVISED SITE PLAN
E REVISED PHASING & UTILITY LAYOUT
09-29-25
09-29-25
Haaland
1321 SUNSET STREET, SUITE 1
IOWA CITY, IA 52246
ISSUED DATE: 10-31-2025
DRAWN BY: KJB
2 of 3
FEET
D.1 REVISED PARKING CALCULATIONS 08-14-25 CHECK BY: MJW H
NO. REVISION DATE APPROVED BY: MJW REV
Sources
- revize: Agenda packet (packet_2025-12-16_68f8c41f-ab61-420c-9e5a-6c45e968ae57.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.