Site Concrete plan sheet · 8.3 × 11.7 in · read from the sheet's title block

A drawing: its labels are read in no particular order. Open the PDF to see the sheet.

Tiffin Community Recreation Center Layout Name: 250120B Construction Schedule Update 11/28/2025 Miron Construction Co., Inc. Data Date: 28-Nov-25 Page 1 of 4 250120-26PM 20251128 Activity ID Resp PredecessorsSuccessors Activity Name Orig Rem Start Finish 2025 2026 Dur Dur Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct ov Tiffin Community Recreation Center 309 232 12-Aug-25 A 27-Oct-26 PRECONSTRUCTION 0 0 PRECONSTRUCTION - BP1 0 0 PRECONSTRUCTION - BP2 0 0 SUBMITTALS 90 80 17-Nov-25 A 24-Mar-26 A1020 GENTRADES 1120 A1030 Casework Submittal 90 80 17-Nov-25 A 24-Mar-26 A/E REVIEW / APPROVAL 10 10 25-Mar-26 07-Apr-26 A1030 GENTRADES A1020 3100 Casework Submittal - Review 10 10 25-Mar-26 07-Apr-26 FAB / DELIVER 217 140 12-Aug-25 A 17-Jun-26 1270 OTIS 1220 1830 Elevator - Fab and Deliver 70 7 12-Aug-25 A 09-Dec-25 2980 MIRON DOOR 2970 1550, Hol ow Metal Frames Fab and Deliver 45 30 30-Sep-25 A 13-Jan-26 1520, 2990 MIRON DOOR 2970 2340 2920 Hol ow Metal Doors Fab and Deliver 60 50 30-Sep-25 A 10-Feb-26 3000 MIRON DOOR 2970 2920, Wood Doors & Hardware Fab and Deliver 70 36 30-Sep-25 A 21-Jan-26 3080 2290 TSF 2210 2380, Steel - Sequence 3 High Steel Fab and Deliver 50 5 03-Oct-25 A 05-Dec-25 2370 2300 TSF 2220 2380 Steel - Sequence 4 GL2 thru GL5 Fab and Deliver 73 28 03-Oct-25 A 09-Jan-26 2310 TSF 2230 2390 Steel - Sequence 5 GL5 thru GL11/Track Fab and Deliver 83 38 03-Oct-25 A 23-Jan-26 1650 MEP 1510 2010 Electrical Gear - Fab and Delivery 70 35 13-Oct-25 A 20-Jan-26 1690 MEP 1910 2850 RTU - Fab and Delivery 60 35 13-Oct-25 A 20-Jan-26 2320 TSF 2240 2400 Steel - Sequence 6 Main Stair Fab and Deliver 106 57 20-Oct-25 A 19-Feb-26 2330 TSF 2250 2410 Steel - Sequence 7 Running Track Stair Fab and Deliver 111 57 20-Oct-25 A 19-Feb-26 2340 TSF 2260 2420 Steel - Sequence 8 Running Track Railing Fab and Deliver 107 57 28-Oct-25 A 19-Feb-26 2350 TSF 2270 2430 Steel - Sequence 9 Mechanical Screen Fab and Deliver 117 72 28-Oct-25 A 12-Mar-26 2530 ZEPHYR 2500, 1840 Curtain Wal /Aluminum Entrance/Glazing Fab and Deliver (Hold 45 45 01-Dec-25 03-Feb-26 3070 RO Openings) 2510 ZEPHYR 2520, 1840 Curtain Wal /Aluminum Entrance/Glazing Fab and Deliver (Field 15 15 02-Feb-26 20-Feb-26 2500, Verif ication Openings) 3100 GENTRADES 3070 A1030 2080 Casework Fab and Delivery 50 50 08-Apr-26 17-Jun-26 SITEWORK 88 88 30-Apr-26 03-Sep-26 2120 SCHRADER 1830 1940 Rough Grade 5 5 30-Apr-26 06-May-26 1940 ALL AMERICAN 2120, 1950, Site Concrete - Curbs and Sidewalks 8 8 07-May-26 18-May-26 1840 1960 1960 SCHRADER 2430, 1870 Final Grade 5 5 19-May-26 26-May-26 1340, 1870 CULVERS 1940 1440, 1760 Landscape 10 10 27-May-26 09-Jun-26 1960 1950 LLPELL 1720, 1760 Asphalt Overlay and Parking Lot Striping 5 5 27-Aug-26 03-Sep-26 1940 CONSTRUCTION 216 207 17-Nov-25 A 22-Sep-26 Actual Work Remaining Work Please review the activities for which you are responsible and the relationships to the activities of other Critical Remaining Work trades. If you have questions or comments, please contact Patrick Myers & Corey Boyles immediately. If Milestone we receive no comments from you by 5 workings days, we will assume a lack of response to be your agreement and commitment to the durations, relationships, and sequencing of this plan. As always, we will attempt to improve upon the dates shown. Periodic updates will be distributed as the project progresses.

Sheets in this document

  • p. 17 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 18 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 19 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 20 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 21 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Hume Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Hume Architects · Tiffin Events Center
  • p. 30 Floor Plan
  • p. 31 C120 · Final OPD Site Plan · MMS Consultants · Park Place City Center - Part One, Phase Four
  • p. 38 A.200 · West Elevation
  • p. 39 A.100 · Floor Plan · Level 2
  • p. 40 Floor Plan · Basement
  • p. 41 A.200 · Building Elevations
  • p. 42 A.201 · East Elevation
  • p. 43 Floor Plan · Level 2
  • p. 44 A.200 · Building Elevations
  • p. 45 Floor Plan · Level 2
  • p. 46 C200 · Site Layout Plan · Iowa DOT · Constructed as Part of Phase I Improvements
  • p. 47 C300 · Site Utilities Plan North · Grove Park Rowhomes
  • p. 48 C301 · Site Utilities Plan South · Grove Park Rowhomes
  • p. 49 Landscape Plan
  • p. 50 Preliminary Plat · Project Total
  • p. 51 2 · Preliminary Plat · Grove Park Rowhomes
  • p. 52 3 · Preliminary Plat
  • p. 91 map
  • p. 98 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 97)
  • p. 134 Site Concrete
  • p. 135 Gym Floor and Slab on Grade · MEP

Sources

  • revize: Agenda packet (packet_2025-12-16_68f8c41f-ab61-420c-9e5a-6c45e968ae57.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.