resolution

Resolutions-2017-044

Dated October 3, 2017 18 pages Res. 2017-044, Res. 2017-042

Open the PDF Searchable (OCR) PDF

Page 4 of 18

Text read by the vision model; check the PDF for anything that matters.
2. The Developer shall provide for the installation of all electric lines, street lights, gas mains, telephone lines and other utility facilities that are necessary at the Developer’s sole cost. Developer further agrees that all utilities shall be installed underground. 3. Any decorative street lighting shall be approved by the City and installed at the Developer's sole cost. 4. At such time as building construction occurs on a lot, but in no event later than five (5) years from the date the subdivision plat is recorded, the Developer or its successor in interest to a lot, shall install sidewalks in said subdivision abutting said lot per the widths approved on the preliminary plat, in accordance with the plans and specifications of the City, and subject to inspections by the City Engineer or designate, unless otherwise shown on the plat or otherwise specified in this Agreement. The following sidewalks shall be installed by the Developer and completed prior to final plat approval: The sidewalk to be constructed along the south side of Parkside Drive; the sidewalk to be constructed along the north side of Parkside Drive which is east of Lot 131. a. A sidewalk must be constructed along Creekside Drive between Lots 110 and 111 as shown on the plat. This duty to install a sidewalk shall be a lien on Lots 110 and 111 of the subdivision until released by the City. b. An eight foot sidewalk must be constructed between Lots 110 and 111 as shown on the final plat, and Lots 142 and 143 as shown on the final plat. This duty to install a sidewalk shall be a lien on Lots 110, 111, 142 and 143 of the subdivision until released by the City. The owners of Lots 142 and 143 are required to maintain this sidewalk. An easement agreement for the sidewalk between Lots 142 and 143 acceptable to the City shall be provided with the final plat documents. 5. The Developer shall submit to the City, for approval by the City Engineer, a storm water management plan which will identify the drainage of this development and specify the manner in which storm water, drainage and runoff will be accommodated. The Developer agrees to dispose of all storm water through the approved storm water and drainage-way system as set forth in the storm water management plan. The design and construction of storm water detention basins, if required by the City for this development, shall be in compliance with the City's current storm water management ordinances and policies. 6. The Developer shall provide water, sewer, utility and drainage easements as shown on the approved final plat. Further, Developer shall provide all off-site easements the City requires that are acceptable to the City. 7. Any wells shall be abandoned in accordance with applicable local, state and federal laws and regulations. 8. The Developer shall meet the requirements laid out in Section 4.08 of the

Sources

  • laserfiche: Resolutions-2017-044 (Resolutions-2017-044.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.