resolution

Resolutions-2017-044

Dated October 3, 2017 18 pages Res. 2017-044, Res. 2017-042

Open the PDF Searchable (OCR) PDF

Page 3 of 18

Text read by the vision model; check the PDF for anything that matters.
the Developer has complied with the security requirements set forth in Section 5.12 of the Tiffin Subdivision Ordinance and Section 8 of this Agreement; and 4. The Developer enters into and abides by this Agreement. B. The Developer further agrees that this Agreement shall be a covenant running with the land and shall be binding on the present and future owners of the property. C. The Developer may grade or otherwise disturb the earth, remove trees, construct sanitary sewer mains, storm sewer mains, water mains, streets, utilities, public improvements or any buildings provided the following conditions have been satisfied: 1. This Agreement has been fully executed by both parties, filed with the City Clerk, and approved by the City Council; 2. The Developer has complied with the pre-construction erosion control and grading provisions set forth in Section 5 of this agreement; and 3. All permits required by local, state, and federal law have been applied for and issued by the appropriate authority. SECTION 3. DEVELOPMENT REQUIREMENTS AND PUBLIC IMPROVEMENTS A. Development Standards. The subdivision shall be developed according to the preliminary subdivision plat as approved by the City and according to the plans and specifications as approved by the City. All construction plans shall be approved before the commencement of any work in accordance with the subdivision plat. There shall be no variance from the preliminary plat, or from the construction plans and specifications, unless approved in writing by the City. B. Public Improvement Standards. All improvements and facilities described in this Agreement shall be constructed and installed by the Developer according to the plans, specifications, ordinances and standards of the City and in accordance with all applicable federal and state laws and regulations. All required inspections shall be performed by the City Engineer or designate. Said inspections shall consist of inspection of the work in progress but shall not relieve or release the Developer from its responsibility to construct said improvements and facilities pursuant to the agreed upon plans and specifications. These improvements and facilities include but are not limited to public water system; sanitary sewer system; storm sewer and drainage-way system; site grading; underground utilities; setting for lot and block monuments; and surveying and staking. C. Standard Requirements. Further, the Developer agrees that: 1. All streets shown on the plat will be constructed of asphalt or concrete paving with concrete curb and gutter, which will be shown on the construction plans, to be approved by the City Engineer, and will be dedicated to the City.

Sources

  • laserfiche: Resolutions-2017-044 (Resolutions-2017-044.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.