9. The Developer is responsible to ensure construction of all off-site public improvements which serve the subdivision are completed, after such plans are approved by the City. The trunk sewer which is to run north from Highway 6, through or just west of Part 3, and to this subdivision must be completed prior to final plat approval. The aforementioned trunk sewer must serve this subdivision. The Developer is prohibited from connecting to the sewer which will run along Park Road.
D. Developer's Obligations. Nothing in this Agreement shall be construed to impose a requirement on the City to install the original public improvements at issue herein, nor shall the Developer be deemed to be acting as the City's agent during the original construction and installation of the above-described improvements. The parties agree that the obligation to install the above-described public improvements herein shall be in accordance with the plans and specifications drafted by the Developer and subject to the approval of the City. Furthermore, the obligations shall remain on the Developer until completion by the Developer and until acceptance by the City, as provided by law.
E. Detention Basins. Upon the completion of grading and excavation for the dry bottom detention basin on Outlot C in a subdivision, and the stabilization of the basin, all in accordance with City approved plans and specifications, Outlot C shall be dedicated to the City for public use and subsequent maintenance by the City, provided that Outlot C shall be in good, suitable condition as a dry-bottom detention basin at the time of said dedication, and acceptable to the City.
F. Fencing. If, at the time of dedication or conveyance to the City of any property (i.e. outlot, right of way, open space), and abutting property is used for agricultural purposes, the Developer must provide the City with a copy of the existing fence agreement. If no fence agreement exists, the Developer must enter into a fence agreement with the adjacent owner that is acceptable to the City. Prior to final plat approval, the Developer must ensure the part of the fence it is responsible for pursuant to the fence agreement is in good condition, subject to approval by the City.
G. Oakdale Boulevard and Park Road. Developer acknowledges that final plat approval may be withheld, at the discretion of the City, until Oakdale Boulevard is constructed and accepted by the City and construction of and improvements to Park Road are completed. Construction must be completed by December 1, 2020, or occupancy permits will be withheld.
H. Temporary Turnaround on Hillside Drive. A temporary easement for use as a temporary dustless surfaced turnaround is required on portions of Lots 118 & 119. The Turnaround area shall meet the size requirements of cul-de-sacs based on street classification. Furthermore, Lots 118 & 119 cannot be sold, transferred, or built upon until Hillside Drive is extended to the south, unless a separate temporary turnaround is provided and approved by the City.