contract agreement · K-4

Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4

Open the PDF Searchable (OCR) PDF

Page 55 of 63

Text from the PDF text layer; check the PDF for anything that matters.
530 Steel Return Grille - 45 Degree Deflection, 3/4" Spacing Submittal Sheet Core Style: Single Deflection Border: F - Flat Frame Fastening: A - Countersunk Screwholes c/w Screws Notes: Blade Pattern: Finish: 45° deflection roll formed blades on 3/4" centers Blades parallel to long dimension B12 - Standard White Factory tolerance ±1/32" Material: Grille - steel construction PROJECT: MCC Room SUBMITTAL NO: 273597-0 SUBMITTAL DATE: 11/19/2025 ENGINEER: CUSTOMER: Fosters Kraus DESCRIPTION: Steel Return Grille - 45 Deg Def, 3/4" Spacing 530-1-1//I/14.000/12.000/SM/F//0.000/0.000/L/A///B12 © Copyright Price Industries 2025 All metric dimensions () are soft converted. Imperial dimensions are converted to metric and rounded to the nearest millimeter. Marketing Release version: , All In One version: 4.25.38.62463 Information within this document is subject to change without notice. Page 1 of 1

Sources

Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...

This document's details as JSON

Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.