contract agreement · K-4
Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 54 of 63
Text from the PDF text layer; check the PDF for anything that matters. Date: 11/19/2025
Price Select Job Name: MCC Room
Grilles, Registers, Diffusers
Job Name MCC Room Contractor
Entered By Brett Stoulil Engineer
Rep Job No Sales Person Brett Stoulil
Location Units Imperial
Customer Fosters Kraus
Model Qty Country Unit Size Border Configuration
530 2 USA 14.000 x F L
12.000
Performance Notes
1. Tested in accordance with ASHRAE Standard 70-2006 "Method of Testing for Rating the Performance of
Air Outlets and Inlets".
2. The NC, sound pressure level, is based on a room absorption of 10dB re 10ˉ¹² Watts in each octave band.
3. Blanks (--) indicate an NC level below 15.
4. Throw data is based on the temperature differential (Dt), in degrees Fahrenheit (°F), between supply air
temperature and room temperature.
5. Throw values, in feet (ft), are provided at terminal air velocities of 150 fpm, 100 fpm, and 50 fpm for
supply applications.
6. Air flow is in cubic feet per minute (cfm).
7. Static pressure (Ps), velocity pressure (Pv), and total pressure (Pt) are in inches of water (in. w.g.).
1 of 1
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.